Leads/word-of-faith-fellowship-cathedrial-inc-project-30-26-16-pasco-fl-c06e2da1
Approved · unknownPasco County

QUIET WATER CONSTRUCTION project — 30-26-16

30-26-16

~3.5kloads
fill dirt + base rock
~5 mo
Lifecycle
Permitted as of Apr 9, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

QUIET WATER CONSTRUCTION project — 30-26-16

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$25K
Actual — from source record
Acreage
25.07 ac
Parcel 30-26-16-0000-29900-0000
Est truck loads
Needs site plan parse
Sources seen
3
Public records referencing this job
General Contractor
QUIET WATER CONSTRUCTION
Developer / Applicant
WORD OF FAITH FELLOWSHIP CATHEDRIAL INC
Why this is a hauling opportunity: NOC — unclassified description: 30-26-16 | Connector base: 50 | Stage = permit_issued — actionable now (+10) | size signal: 25 ac disturbed, ~3482 est. loads (+25) | stage=permit_issued, recent (+10) | size signal: 25 ac disturbed, ~3482 est. loads (+25) | stage=permit_issued, recent (+10) | size signal: 25 ac disturbed, ~3482 est. loads (+25) | stage=permit_issued, recent (+10) | size signal: 25 ac disturbed, ~3482 est. loads (+25) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21PASCO_NOC
    Captured Pasco_2026064574 from pasco_noc
  2. 2026-05-28FL_DOR_CADASTRAL
    Captured FDOR_30-26-16-0000-29900-0000_2cef10cf from fl_dor_cadastral
  3. 2026-06-08PASCOPA
    Captured PASCOPA_30-26-16-0000-29900-0000_2cef10cf from pascopa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (sand pit)
County Line Mine · Spring Hill
One-way
19.5 mi
Round trip
38.9 mi
TypeNameCityOne-wayRT mi
sand pitCounty Line MineSpring Hill19.5 mi38.9
quarryGeorgia Stone Spring Hill QuarryAtlanta 20.2 mi40.5
quarryTampa Cement Grinding PlantTampa25.5 mi51
quarryCentral State Aggregates LLCZephyrhill27.1 mi54.2
quarryBrooksville QuarryBrooksville32.4 mi64.8
quarryBrooksville South Cement PlantBrooksville33.2 mi66.3
quarryCalcium PlantJacksonville35.9 mi71.9
quarryCaloosa MaterialsRuskin38.6 mi77.2
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
WORD OF FAITH FELLOWSHIP CATHEDRIAL INC
1 active project · Pasco
~3,482 est. loads · fill dirt
Contractor
QUIET WATER CONSTRUCTION
1 active project · Pasco
~3,482 est. loads · fill dirt

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
pasco_nocPasco_20260645742026-05-21Open ↗
fl_dor_cadastralFDOR_30-26-16-0000-29900-0000_2cef10cf2026-05-28Open ↗
pascopaPASCOPA_30-26-16-0000-29900-0000_2cef10cf2026-06-08Open ↗

Parcel Detail

Pasco County Property Appraiser

PropertyPASCOPA
Folio
30-26-16-0000-29900-0000
Strap
30-26-16-0000-29900-0000
Address
Acreage
25.07 ac
Sq ft
1,092,049
Owner of record
FL DEPT OF TRANSPORTATION
BUREAU OF RIGHT OF WAY
Last sale

No sale on record

Appraiser valuation
Just (market)
$25,070

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/word-of-faith-fellowship-cathedrial-inc-project-30-26-16-pasco-fl-c06e2da1