Leads/wilson-mike-project-15-25-20-pasco-fl-533f8842
Approved · unknownPasco County

JTB POOL CONTRACTING INC project — 15-25-20

15-25-20

~235loads
fill dirt + base rock
2 wk
Lifecycle
Permitted as of May 1, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

JTB POOL CONTRACTING INC project — 15-25-20

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
1.69 ac
Parcel 15-25-20-0070-0B200-0000
Est truck loads
Needs site plan parse
Sources seen
3
Public records referencing this job
General Contractor
JTB POOL CONTRACTING INC
Developer / Applicant
WILSON MIKE
Why this is a hauling opportunity: NOC — unclassified description: 15-25-20 | Connector base: 50 | Stage = permit_issued — actionable now (+10) | size signal: 1.7 ac disturbed, ~235 est. loads (+12) | stage=permit_issued, recent (+10) | size signal: 1.7 ac disturbed, ~235 est. loads (+12) | stage=permit_issued, recent (+10) | size signal: 1.7 ac disturbed, ~235 est. loads (+12) | stage=permit_issued, recent (+10) | size signal: 1.7 ac disturbed, ~235 est. loads (+12) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-22PASCO_NOC
    Captured Pasco_2026081283 from pasco_noc
  2. 2026-05-28FL_DOR_CADASTRAL
    Captured FDOR_15-25-20-0070-0B200-0000_a041f5b4 from fl_dor_cadastral
  3. 2026-06-08PASCOPA
    Captured PASCOPA_15-25-20-0070-0B200-0000_a041f5b4 from pascopa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Central State Aggregates LLC · Zephyrhill
One-way
7.3 mi
Round trip
14.5 mi
TypeNameCityOne-wayRT mi
quarryCentral State Aggregates LLCZephyrhill7.3 mi14.5
quarryGeorgia Stone Spring Hill QuarryAtlanta 12.9 mi25.9
quarryWest Florida AggregateWebster16.8 mi33.6
sand pitCounty Line MineSpring Hill18.7 mi37.4
quarryBrooksville South Cement PlantBrooksville20.8 mi41.5
quarryBrooksville QuarryBrooksville20.9 mi41.9
quarryCenter Hill MineBrooksville23.6 mi47.1
quarryCalcium PlantJacksonville23.9 mi47.8
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
WILSON MIKE
1 active project · Pasco
~235 est. loads · fill dirt
Contractor
JTB POOL CONTRACTING INC
1 active project · Pasco
~235 est. loads · fill dirt

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
pasco_nocPasco_20260812832026-05-22Open ↗
fl_dor_cadastralFDOR_15-25-20-0070-0B200-0000_a041f5b42026-05-28Open ↗
pascopaPASCOPA_15-25-20-0070-0B200-0000_a041f5b42026-06-08Open ↗

Parcel Detail

Pasco County Property Appraiser

PropertyPASCOPA
Folio
15-25-20-0070-0B200-0000
Strap
15-25-20-0070-0B200-0000
Address
Acreage
1.69 ac
Sq ft
73,616
Use
Vacant
Owner of record
MIRADA COMMUNITY DEVELOPMENT DISTRICT
Last sale
2018-11-01
$2,701,600
Appraiser valuation
Just (market)
$0

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/wilson-mike-project-15-25-20-pasco-fl-533f8842