Leads/totally-blu-builders-project-36-25-18-pasco-fl-e8ddcf8c
Approved · unknownPasco County

TOTALLY BLU BUILDERS project — 36-25-18

36-25-18

Load estimate pending
Lifecycle
Permitted as of Nov 18, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

TOTALLY BLU BUILDERS project — 36-25-18

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
TOTALLY BLU BUILDERS
Developer / Applicant
QUAGLIANA LISA
The story

**TOTALLY BLU BUILDERS Site Development (36-25-18)** TOTALLY BLU BUILDERS has just received permit approval for earthwork on a site development project at 36-25-18, creating an immediate hauling opportunity for excavation, grading, and material movement. This is a high-priority prospect (75/100 hauling score) with a strong general contractor track record and active permitting stage, meaning mobilization could begin within weeks. Reach out directly to TOTALLY BLU BUILDERS and owner/developer Lisa Quagliana to bid on soil export, fill material delivery, and site debris removal before work commences.

Why this is a hauling opportunity: General contractor NOC: TOTALLY BLU BUILDERS | Connector base: 65 | Stage = permit_issued — actionable now (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21PASCO_NOC
    Captured Pasco_2025216961 from pasco_noc

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Georgia Stone Spring Hill Quarry · Atlanta
One-way
8.5 mi
Round trip
17 mi
TypeNameCityOne-wayRT mi
quarryGeorgia Stone Spring Hill QuarryAtlanta 8.5 mi17
quarryCentral State Aggregates LLCZephyrhill10.9 mi21.8
sand pitCounty Line MineSpring Hill13.3 mi26.6
quarryBrooksville QuarryBrooksville22.0 mi43.9
quarryBrooksville South Cement PlantBrooksville22.3 mi44.6
quarryTampa Cement Grinding PlantTampa22.8 mi45.6
quarryCalcium PlantJacksonville25.6 mi51.2
quarryWest Florida AggregateWebster25.9 mi51.9
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
QUAGLIANA LISA
Contractor
TOTALLY BLU BUILDERS
1 active project · Pasco

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
pasco_nocPasco_20252169612026-05-21Open ↗

Parcel Detail

Property records and ownership

Property
County
Pasco
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/totally-blu-builders-project-36-25-18-pasco-fl-e8ddcf8c