Leads/terry-2460-land-trust-project-sarasota-county-sarasota-fl-038475e3
Approved · unknownSarasota County

TERRY 2460 LAND TRUST project — Sarasota County

2460 TERRY LN

Load estimate pending
Lifecycle
Permitted as of Oct 15, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

TERRY 2460 LAND TRUST project — Sarasota County

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
TERRY 2460 LAND TRUST
Developer / Applicant
EHB OF TAMPA BAY INC TR
Why this is a hauling opportunity: NOC with no description — unknown scope | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-07-07SARASOTA_NOC
    Captured Sarasota_2025151304 from sarasota_noc

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Florida Shell & Fill Company LLC · Naples
One-way
24.5 mi
Round trip
49.1 mi
TypeNameCityOne-wayRT mi
quarryFlorida Shell & Fill Company LLCNaples24.5 mi49.1
quarryWingate Creek MineLithia29.0 mi58
quarryCaloosa MaterialsRuskin30.5 mi61.1
quarry4M-31 MineAlva40.5 mi80.9
sand pitWashington Loop MinePunta Gorda40.6 mi81.1
quarryBermont Materials AlicoPunta Gorda42.2 mi84.5
quarrySouth Pasture MineLithia43.7 mi87.3
quarryTampa Cement Grinding PlantTampa46.5 mi92.9
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
EHB OF TAMPA BAY INC TR
Contractor
TERRY 2460 LAND TRUST

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Sarasota County Permits
Sarasota / Venice building permit search
ConnectorRecord IDCapturedLink
sarasota_nocSarasota_20251513042026-07-07Open ↗

Parcel Detail

Property records and ownership

Property
County
Sarasota
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/terry-2460-land-trust-project-sarasota-county-sarasota-fl-038475e3