Leads/szekeres-karoly-project-10114-lake-cove-ln-tampa-fl-33618-hillsborough-fl-8925c148
Approved · unknownHillsborough County

NOC – Finney Richard C Finney Deanna | Karoly Szekeres | 10114 LAKE COVE LN TAMPA

10114 LAKE COVE LN TAMPA, FL 33618

~12loads
fill dirt + base rock
≤1 wk
Lifecycle
Permitted as of Dec 17, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

NOC – Finney Richard C Finney Deanna | Karoly Szekeres | 10114 LAKE COVE LN TAMPA

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
0.083 ac
Parcel 0234740034
Est truck loads
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor
SZEKERES KAROLY
📞 (727) 270-8662
Developer / Applicant
FINNEY DEANNA
Why this is a hauling opportunity: NOC filing is strongest job-is-real signal; REPLACING 11 WINDOWS AND 1 SLIDING GLASS DOOR, SIZE FOR SIZE AND IMPACT | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21OFFICIAL_RECORDS_NOC
    Captured Hillsborough_2025532700 from official_records_noc
  2. 2026-05-22HCPA
    Captured HCPA_0234740034_ce0d4f6b from hcpa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
8.1 mi
Round trip
16.2 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa8.1 mi16.2
quarryCentral State Aggregates LLCZephyrhill16.4 mi32.8
quarryGeorgia Stone Spring Hill QuarryAtlanta 23.7 mi47.3
quarryCaloosa MaterialsRuskin23.8 mi47.5
sand pitCounty Line MineSpring Hill27.2 mi54.5
quarryFour CornersLithia37.4 mi74.7
quarryBrooksville QuarryBrooksville37.4 mi74.8
quarryBrooksville South Cement PlantBrooksville37.7 mi75.5
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
FINNEY DEANNA
Contractor
SZEKERES KAROLY
3 active projects · Hillsborough
~6 est. loads · fill dirt
📞 (727) 270-8662

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Hillsborough County Permits
Tampa area permits, inspections, reviews
ConnectorRecord IDCapturedLink
official_records_nocHillsborough_20255327002026-05-21Open ↗
hcpaHCPA_0234740034_ce0d4f6b2026-05-22Open ↗

Parcel Detail

Hillsborough Property Appraiser

PropertyHCPA
Folio
0234740034
Strap
U-15-28-18-127-000002-00010.0
Address
10114 LAKE COVE LN, TAMPA
Zip
33618
Acreage
0.083 ac
Sq ft
3,634
Homestead
YES
Owner of record
FINNEY RICHARD C
FINNEY DEANNA
Last sale
2016-05-25
$100(transfer)

Site Plan & Engineering

Linked documents

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/szekeres-karoly-project-10114-lake-cove-ln-tampa-fl-33618-hillsborough-fl-8925c148