STREAMLINE ELECTRICAL DESIGN project — Sarasota County
201 W MIAMI VENICE
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Lifecycle Timeline
Every signal we've seen, in order
- 2026-07-11SARASOTA_NOCCaptured Sarasota_2025108432 from sarasota_noc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Florida Shell & Fill Company LLC | Naples | 7.0 mi | 14 |
| sand pit | Washington Loop Mine | Punta Gorda | 28.3 mi | 56.6 |
| quarry | Bermont Materials Alico | Punta Gorda | 29.6 mi | 59.2 |
| quarry | 4M-31 Mine | Alva | 35.4 mi | 70.8 |
| quarry | Wingate Creek Mine | Lithia | 36.4 mi | 72.8 |
| quarry | Halls Mine | Naples | 39.0 mi | 77.9 |
| sand pit | Watermelon Pit | Punta Gorda | 39.6 mi | 79.2 |
| quarry | Highlands County Shell Pit | Sebring | 40.1 mi | 80.2 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| sarasota_noc | Sarasota_2025108432 | 2026-07-11 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Sarasota
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/streamline-electrical-design-project-sarasota-county-sarasota-fl-a6d1b6d6