Approved · unknownPasco County
UNITED STATES FIRE INSURANCE project — 14-26-18
14-26-18
Load estimate pending
Lifecycle
Permitted as of Apr 14, 2026
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
UNITED STATES FIRE INSURANCE project — 14-26-18
My Pipeline
Tag this lead — private to you, builds your bid history over time
Loading pipeline status…
Summary
Key numbers at a glance
Project value
—
No recorded value on file
Acreage
—
Est truck loads
—
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
UNITED STATES FIRE INSURANCE
Developer / Applicant
STANLEY RANDY E SR
Why this is a hauling opportunity: NOC — unclassified description: 14-26-18 | Connector base: 50 | Stage = permit_issued — actionable now (+10) | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-21PASCO_NOCCaptured Pasco_2026068623 from pasco_noc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
Closest import source (quarry)
Central State Aggregates LLC · Zephyrhill
One-way
11.1 mi
Round trip
22.3 mi
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Central State Aggregates LLC | Zephyrhill | 11.1 mi | 22.3 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 11.4 mi | 22.7 |
| sand pit | County Line Mine | Spring Hill | 15.6 mi | 31.2 |
| quarry | Tampa Cement Grinding Plant | Tampa | 19.9 mi | 39.8 |
| quarry | Brooksville Quarry | Brooksville | 25.0 mi | 50.1 |
| quarry | Brooksville South Cement Plant | Brooksville | 25.4 mi | 50.8 |
| quarry | West Florida Aggregate | Webster | 28.7 mi | 57.4 |
| quarry | Calcium Plant | Jacksonville | 28.7 mi | 57.4 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Developer
STANLEY RANDY E SR
1 active project · Pasco
Contractor
UNITED STATES FIRE INSURANCE
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| pasco_noc | Pasco_2026068623 | 2026-05-21 | Open ↗ |
Parcel Detail
Property records and ownership
Property
- County
- Pasco
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)
Site Plan & Engineering
Linked documents
No site plan documents yet. (PDF extraction connector pending.)
Bid Data
Who bid, who won
No bid data. (Public bid connectors pending.)
Activity & Notes
Your internal log
Loading notes…
Log call:
0 chars
/leads/stanley-randy-e-sr-project-14-26-18-pasco-fl-1de2d561