Leads/spencer-abigail-project-05-26-16-pasco-fl-344029d3
Approved · unknownPasco County

QUINN HOMES INC project — 05-26-16

05-26-16

~1.8kloads
fill dirt + base rock
~3 mo
Lifecycle
Permitted as of Apr 30, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

QUINN HOMES INC project — 05-26-16

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$6K
Actual — from source record
Acreage
12.83 ac
Parcel 05-26-16-0000-29900-0010
Est truck loads
Needs site plan parse
Sources seen
3
Public records referencing this job
General Contractor
QUINN HOMES INC
Developer / Applicant
SPENCER ABIGAIL
Why this is a hauling opportunity: NOC — unclassified description: 05-26-16 | Connector base: 50 | Stage = permit_issued — actionable now (+10) | size signal: 13 ac disturbed, ~1782 est. loads (+25) | stage=permit_issued, recent (+10) | size signal: 13 ac disturbed, ~1782 est. loads (+25) | stage=permit_issued, recent (+10) | size signal: 13 ac disturbed, ~1782 est. loads (+25) | stage=permit_issued, recent (+10) | size signal: 13 ac disturbed, ~1782 est. loads (+25) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21PASCO_NOC
    Captured Pasco_2026080452 from pasco_noc
  2. 2026-05-28FL_DOR_CADASTRAL
    Captured FDOR_05-26-16-0000-29900-0010_b886d7db from fl_dor_cadastral
  3. 2026-06-08PASCOPA
    Captured PASCOPA_05-26-16-0000-29900-0010_b886d7db from pascopa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (sand pit)
County Line Mine · Spring Hill
One-way
15.6 mi
Round trip
31.3 mi
TypeNameCityOne-wayRT mi
sand pitCounty Line MineSpring Hill15.6 mi31.3
quarryGeorgia Stone Spring Hill QuarryAtlanta 17.1 mi34.1
quarryCentral State Aggregates LLCZephyrhill26.3 mi52.6
quarryTampa Cement Grinding PlantTampa27.8 mi55.5
quarryBrooksville QuarryBrooksville28.6 mi57.2
quarryBrooksville South Cement PlantBrooksville29.4 mi58.8
quarryCalcium PlantJacksonville32.1 mi64.2
quarryCenter Hill MineBrooksville36.0 mi71.9
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
SPENCER ABIGAIL
1 active project · Pasco
~1,782 est. loads · fill dirt
Contractor
QUINN HOMES INC
1 active project · Pasco
~1,782 est. loads · fill dirt
2982 BRADFORD CIRCLE PALM HARBOR, FL 34685
People (1)
  • JAMES K SPENCER · PSTD

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
pasco_nocPasco_20260804522026-05-21Open ↗
fl_dor_cadastralFDOR_05-26-16-0000-29900-0010_b886d7db2026-05-28Open ↗
pascopaPASCOPA_05-26-16-0000-29900-0010_b886d7db2026-06-08Open ↗

Parcel Detail

Pasco County Property Appraiser

PropertyPASCOPA
Folio
05-26-16-0000-29900-0010
Strap
05-26-16-0000-29900-0010
Address
Acreage
12.83 ac
Sq ft
558,875
Owner of record
TIITF/STATE OF FLORIDA
Last sale

No sale on record

Appraiser valuation
Just (market)
$6,415

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/spencer-abigail-project-05-26-16-pasco-fl-344029d3