USA CD GROUP LLC project — 13-26-20
13-26-20
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
SITEX NR Development is a site development project in the 13-26-20 area currently at permit-issued stage with significant earthwork requirements, representing a high-hauling opportunity (75/100 score). The project involves substantial material movement and soil work typical of site prep phases, making it ideal for excavation debris removal, fill hauling, and general earthwork support. Contact SITEX NR Development LLC (prime GC) and USA CD Group LLC (owner/developer) immediately while permits are fresh and mobilization planning is underway.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-21PASCO_NOCCaptured Pasco_2025217395 from pasco_noc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Central State Aggregates LLC | Zephyrhill | 2.4 mi | 4.7 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 17.9 mi | 35.8 |
| quarry | West Florida Aggregate | Webster | 21.2 mi | 42.3 |
| quarry | Tampa Cement Grinding Plant | Tampa | 22.6 mi | 45.2 |
| sand pit | County Line Mine | Spring Hill | 23.7 mi | 47.4 |
| quarry | Brooksville South Cement Plant | Brooksville | 27.1 mi | 54.2 |
| quarry | Brooksville Quarry | Brooksville | 27.3 mi | 54.5 |
| quarry | Center Hill Mine | Brooksville | 29.8 mi | 59.6 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| pasco_noc | Pasco_2025217395 | 2026-05-21 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Pasco
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/sitex-nr-development-llc-project-13-26-20-pasco-fl-2e270316