Leads/rosemont-septic-to-sewer-conversion-fl-d3756f2c
Approved · unknown

ROSEMONT SEPTIC TO SEWER CONVERSION

--, ORLANDO, FL, 32801

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Construction underway — hauling demand peaks here

Location

The workspace from above — satellite by default

ROSEMONT SEPTIC TO SEWER CONVERSION

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
ROSEMONT SEPTIC TO SEWER CONVERSION
The story

The Rosemont Septic to Sewer Conversion project in Orlando, FL, involves site development focused on stormwater management and is currently under construction. This project presents significant hauling opportunities due to its active construction general permit, indicating a strong need for earthwork and material transport. Key contact for this project is the owner and developer, Rosemont Septic to Sewer Conversion, who can facilitate hauling engagements.

Why this is a hauling opportunity: Base site_development/stormwater (40) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21NPDES_STORMWATER
    Captured FLR20IT13 from npdes_stormwater

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (sand pit)
Center Sand Company · Clermont
One-way
18.9 mi
Round trip
37.8 mi
TypeNameCityOne-wayRT mi
sand pitCenter Sand CompanyClermont18.9 mi37.8
sand pitIndependent MineDavenport19.6 mi39.2
sand pitFour Corners Sand MineBrooksville19.8 mi39.6
quarryS & L Materials IncKISSIMMEE22.4 mi44.7
sand pitHilochee Sand MineDavenport22.8 mi45.7
quarryBeeline MineOrlando23.4 mi46.8
sand pitCypress SandLexington23.9 mi47.9
sand pitAstatula Sand PlantJacksonville24.2 mi48.4
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
ROSEMONT SEPTIC TO SEWER CONVERSION

Permits & Sources

Every connector that's seen this project

ACTIVEStormwater Construction Notice (NPDES)(NPDES Construction General Permit (CGP))

Filed days before land disturbance begins on sites over 1 acre. One of the strongest 'trucks imminent' signals there is.

ConnectorRecord IDCapturedLink
npdes_stormwaterFLR20IT132026-05-21Open ↗

Parcel Detail

Property records and ownership

Property
City
ORLANDO
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/rosemont-septic-to-sewer-conversion-fl-d3756f2c