Leads/rodriguez-nolan-project-01-25-17-pasco-fl-4b7a0c3a
Approved · unknownPasco County

US SHINGLE LLC project — 01-25-17

01-25-17

~4loads
fill dirt + base rock
≤1 wk
Lifecycle
Permitted as of Jun 17, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

US SHINGLE LLC project — 01-25-17

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
0.03 ac
Parcel 01-25-17-0030-00M00-0000
Est truck loads
Needs site plan parse
Sources seen
3
Public records referencing this job
General Contractor
US SHINGLE LLC
📞 (239) 355-0754
Developer / Applicant
LONE STAR RANCH HOMEOWNERS
Why this is a hauling opportunity: NOC — unclassified description: 01-25-17 | Connector base: 50 | Stage = permit_issued — actionable now (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10) | single-trade residential permit — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21PASCO_NOC
    Captured Pasco_2025116815 from pasco_noc
  2. 2026-05-28FL_DOR_CADASTRAL
    Captured FDOR_01-25-17-0030-00M00-0000_7fae4d8c from fl_dor_cadastral
  3. 2026-06-08PASCOPA
    Captured PASCOPA_01-25-17-0030-00M00-0000_7fae4d8c from pascopa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Georgia Stone Spring Hill Quarry · Atlanta
One-way
5.4 mi
Round trip
10.8 mi
TypeNameCityOne-wayRT mi
quarryGeorgia Stone Spring Hill QuarryAtlanta 5.4 mi10.8
sand pitCounty Line MineSpring Hill6.6 mi13.1
quarryBrooksville QuarryBrooksville18.4 mi36.7
quarryCentral State Aggregates LLCZephyrhill18.6 mi37.1
quarryBrooksville South Cement PlantBrooksville19.0 mi38
quarryCalcium PlantJacksonville22.1 mi44.1
quarryCenter Hill MineBrooksville25.2 mi50.4
quarryWest Florida AggregateWebster28.4 mi56.8
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
LONE STAR RANCH HOMEOWNERS
Contractor
US SHINGLE LLC
23 active projects · Pasco
~7 est. loads · fill dirt
📞 (239) 355-0754

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
pasco_nocPasco_20251168152026-05-21Open ↗
fl_dor_cadastralFDOR_01-25-17-0030-00M00-0000_7fae4d8c2026-05-28Open ↗
pascopaPASCOPA_01-25-17-0030-00M00-0000_7fae4d8c2026-06-08Open ↗

Parcel Detail

Pasco County Property Appraiser

PropertyPASCOPA
Folio
01-25-17-0030-00M00-0000
Strap
01-25-17-0030-00M00-0000
Address
Acreage
0.03 ac
Sq ft
1,307
Owner of record
LONE STAR RANCH HOMEOWNERS
ASSOCIATION INC
Last sale

No sale on record

Appraiser valuation
Just (market)
$0

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/rodriguez-nolan-project-01-25-17-pasco-fl-4b7a0c3a