Leads/rimos-thomas-project-33-25-16-pasco-fl-4fcfccc6
Approved · unknownPasco County

UNICITY SOLAR ENERGY LLC project — 33-25-16

33-25-16

Load estimate pending
Lifecycle
Permitted as of Feb 25, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

UNICITY SOLAR ENERGY LLC project — 33-25-16

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor
UNICITY SOLAR ENERGY LLC
Developer / Applicant
RIMOS THOMAS
Why this is a hauling opportunity: NOC — unclassified description: 33-25-16 | Connector base: 50 | Stage = permit_issued — actionable now (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21PASCO_NOC
    Captured Pasco_2026035013 from pasco_noc

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (sand pit)
County Line Mine · Spring Hill
One-way
14.3 mi
Round trip
28.6 mi · ~55 min
Rate / load
$140–$175
TypeNameCityOne-wayRT mi~CycleRate / load
sand pitCounty Line MineSpring Hill14.3 mi28.6~55m$140–$175
quarryGeorgia Stone Spring Hill QuarryAtlanta 15.7 mi31.4~75m$175–$230
quarryCentral State Aggregates LLCZephyrhill25.5 mi50.9~100m$230–$290
quarryBrooksville QuarryBrooksville27.3 mi54.5~100m$230–$290
quarryTampa Cement Grinding PlantTampa27.9 mi55.8~100m$230–$290
quarryBrooksville South Cement PlantBrooksville28.1 mi56.1~100m$230–$290
quarryCalcium PlantJacksonville30.8 mi61.5~100m$230–$290
quarryCenter Hill MineBrooksville34.6 mi69.2~100m$230–$290
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

Developer
RIMOS THOMAS
1 active project · Pasco
Contractor
UNICITY SOLAR ENERGY LLC
1 active project · Hillsborough
4515 George Rd suite 340 Tampa, FL 33634

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
pasco_nocPasco_20260350132026-05-21Open ↗

Parcel Detail

Property records and ownership

Property
County
Pasco
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/rimos-thomas-project-33-25-16-pasco-fl-4fcfccc6