Leads/remove-existing-roof-and-install-new-gaf-shingles-with-peel-n-stick-and-sbs-flat-9a9a1e53
Approved · unknownHillsborough County

Remove existing roof and install new GAF shingles with peel n stick and SBS flat roof

718 S Boulevard, T, 33606

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

Remove existing roof and install new GAF shingles with peel n stick and SBS flat roof

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant
Timothy Ernest And Michelle Gutenstein Hinz
Why this is a hauling opportunity: Base unknown/other (20) | single-trade residential permit — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-06-02TAMPA_ACCELA
    Captured ARC-26-0000319 from tampa_accela

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
1.6 mi
Round trip
3.2 mi · ~25 min
Rate / load
$85–$110
TypeNameCityOne-wayRT mi~CycleRate / load
quarryTampa Cement Grinding PlantTampa1.6 mi3.2~25m$85–$110
quarryCaloosa MaterialsRuskin16.2 mi32.4~75m$175–$230
quarryCentral State Aggregates LLCZephyrhill21.3 mi42.6~75m$175–$230
quarryGeorgia Stone Spring Hill QuarryAtlanta 31.1 mi62.2~100m$230–$290
quarryFour CornersLithia32.7 mi65.3~100m$230–$290
sand pitCounty Line MineSpring Hill34.8 mi69.6~100m$230–$290
quarryWingate Creek MineLithia36.9 mi73.7~100m$230–$290
quarrySouth Pasture MineLithia37.6 mi75.3~100m$230–$290
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

Developer
Timothy Ernest And Michelle Gutenstein Hinz

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Hillsborough County Permits
Tampa area permits, inspections, reviews
ConnectorRecord IDCapturedLink
tampa_accelaARC-26-00003192026-06-02Open ↗

Parcel Detail

Property records and ownership

Property
County
Hillsborough
City
Tampa
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/remove-existing-roof-and-install-new-gaf-shingles-with-peel-n-stick-and-sbs-flat-9a9a1e53