Remove existing roof and install new GAF shingles with peel n stick and SBS flat roof
718 S Boulevard, T, 33606
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Not yet identified
Lifecycle Timeline
Every signal we've seen, in order
- 2026-06-02TAMPA_ACCELACaptured ARC-26-0000319 from tampa_accela
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions
| Type | Name | City | One-way | RT mi | ~Cycle | Rate / load |
|---|---|---|---|---|---|---|
| quarry | Tampa Cement Grinding Plant | Tampa | 1.6 mi | 3.2 | ~25m | $85–$110 |
| quarry | Caloosa Materials | Ruskin | 16.2 mi | 32.4 | ~75m | $175–$230 |
| quarry | Central State Aggregates LLC | Zephyrhill | 21.3 mi | 42.6 | ~75m | $175–$230 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 31.1 mi | 62.2 | ~100m | $230–$290 |
| quarry | Four Corners | Lithia | 32.7 mi | 65.3 | ~100m | $230–$290 |
| sand pit | County Line Mine | Spring Hill | 34.8 mi | 69.6 | ~100m | $230–$290 |
| quarry | Wingate Creek Mine | Lithia | 36.9 mi | 73.7 | ~100m | $230–$290 |
| quarry | South Pasture Mine | Lithia | 37.6 mi | 75.3 | ~100m | $230–$290 |
| See /material-sources for the full directory. | ||||||
Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| tampa_accela | ARC-26-0000319 | 2026-06-02 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Hillsborough
- City
- Tampa
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/remove-existing-roof-and-install-new-gaf-shingles-with-peel-n-stick-and-sbs-flat-9a9a1e53