Leads/remove-16-ash-tree-rear-corner-of-property-hillsborough-fl-b0837708
Approved · unknownHillsborough County

Remove 16" Ash Tree, rear corner of property.

910 E Lake Ave, T, 33605

~2loads
fill dirt
≤1 wk
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

Remove 16" Ash Tree, rear corner of property.

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$435K
Actual — from source record
Acreage
0.022 ac
Parcel 1730290000
Est truck loads
Needs site plan parse
Sources seen
3
Public records referencing this job
General Contractor
ARBOR BAY
Developer / Applicant
Nicole Kristin Mcgee
Why this is a hauling opportunity: Base unknown/other (20) | size signal: $434,599 valuation (+5)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-06-26TAMPA_ACCELA
    Captured TRE-26-0000967 from tampa_accela
  2. 2026-06-26HCPA
    Captured HCPA_1730290000_aef89ecf from hcpa
  3. 2026-06-26FL_DOR_CADASTRAL
    Captured FDOR_1929074MD000004000100A_aef89ecf from fl_dor_cadastral

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
2.9 mi
Round trip
5.9 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa2.9 mi5.9
quarryCentral State Aggregates LLCZephyrhill18.2 mi36.5
quarryCaloosa MaterialsRuskin19.0 mi38
quarryGeorgia Stone Spring Hill QuarryAtlanta 28.3 mi56.6
sand pitCounty Line MineSpring Hill32.2 mi64.4
quarryFour CornersLithia32.8 mi65.6
quarrySouth Pasture MineLithia38.3 mi76.7
quarryWingate Creek MineLithia38.7 mi77.3
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
Nicole Kristin Mcgee
Contractor
ARBOR BAY
2 active projects · Hillsborough
~2 est. loads · fill dirt
Applicant
ARBOR BAY
2 active projects · Hillsborough
~2 est. loads · fill dirt

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Hillsborough County Permits
Tampa area permits, inspections, reviews
ConnectorRecord IDCapturedLink
tampa_accelaTRE-26-00009672026-06-26Open ↗
hcpaHCPA_1730290000_aef89ecf2026-06-26Open ↗
fl_dor_cadastralFDOR_1929074MD000004000100A_aef89ecf2026-06-26Open ↗

Parcel Detail

Hillsborough Property Appraiser

PropertyHCPA
Folio
1730290000
Strap
A-07-29-19-4MD-000004-00010.0
Address
910 E LAKE AVE, TAMPA
Zip
33605
Acreage
0.022 ac
Sq ft
956
Homestead
YES
Owner of record
MCGEE NICOLE KRISTIN
Last sale
2019-07-25
$250,000

Site Plan & Engineering

Linked documents

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/remove-16-ash-tree-rear-corner-of-property-hillsborough-fl-b0837708