Leads/racetrac-at-page-field-lee-fl-e8e12ec2
Approved · unknownLee County

RACETRAC AT PAGE FIELD

4451 CLEVELAND AVE, FORT MYERS, FL, 33901-9011

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

RACETRAC AT PAGE FIELD

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant
RACETRAC AT PAGE FIELD
Why this is a hauling opportunity: Base site_development/stormwater (40) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21NPDES_STORMWATER
    Captured FLR20AP55 from npdes_stormwater

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (quarry)
ALICO ROAD QUARRY · Miami
One-way
10.4 mi
Round trip
20.7 mi · ~55 min
Rate / load
$140–$175
TypeNameCityOne-wayRT mi~CycleRate / load
quarryALICO ROAD QUARRYMiami10.4 mi20.7~55m$140–$175
quarryFort Myers MineJacksonville12.1 mi24.1~55m$140–$175
quarryFort Myers QuarryFort Myers13.1 mi26.2~55m$140–$175
quarryJayrockPunta Gorda15.1 mi30.2~75m$175–$230
quarrySRM Materials Punta GordaMurfreesboro15.5 mi31~75m$175–$230
quarryBell MineFort Myers17.0 mi33.9~75m$175–$230
sand pitCorkscrewEstero20.0 mi40~75m$175–$230
quarryBermont Materials AlicoPunta Gorda24.2 mi48.4~75m$175–$230
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

Developer
RACETRAC AT PAGE FIELD

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Lee County Permits
Fort Myers / Cape Coral permit search
ConnectorRecord IDCapturedLink
npdes_stormwaterFLR20AP552026-05-21Open ↗

Parcel Detail

Property records and ownership

Property
County
Lee
City
FORT MYERS
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/racetrac-at-page-field-lee-fl-e8e12ec2