PROTECH CONSTRUCTION SERVICES LLC project — 06-24-21
06-24-21
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
PROTECH Construction Services LLC is undertaking a site development earthwork project in the permit-issued stage, presenting an immediate hauling opportunity for excavation, fill material transport, and site preparation. With a strong 75/100 hauling score driven by active permitting status, this project requires coordination with PROTECH (general contractor) and owner JAGGIE LAWRENCE for material movement and debris removal services. Contact PROTECH directly to establish hauling contracts before mobilization begins, as earthwork projects typically demand reliable, volume-based hauling capacity early in the execution phase.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-22PASCO_NOCCaptured Pasco_2026075452 from pasco_noc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | West Florida Aggregate | Webster | 8.8 mi | 17.5 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 15.1 mi | 30.2 |
| quarry | Brooksville South Cement Plant | Brooksville | 15.6 mi | 31.3 |
| quarry | Central State Aggregates LLC | Zephyrhill | 15.6 mi | 31.3 |
| quarry | Brooksville Quarry | Brooksville | 16.2 mi | 32.4 |
| quarry | Center Hill Mine | Brooksville | 16.4 mi | 32.7 |
| quarry | Calcium Plant | Jacksonville | 18.2 mi | 36.4 |
| quarry | Mid-Coast Aggregates LLC-Mazak Mine | Webster | 19.6 mi | 39.1 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| pasco_noc | Pasco_2026075452 | 2026-05-22 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Pasco
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/protech-construction-services-llc-project-06-24-21-pasco-fl-2cbe640c