Leads/progress-residential-borrower-9-llc-project-18-26-19-pasco-fl-8cea0c55
Approved · unknownPasco County

JBC GROUP INC project — 18-26-19

18-26-19

Load estimate pending
Lifecycle
Permitted as of Mar 25, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

JBC GROUP INC project — 18-26-19

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
JBC GROUP INC
Developer / Applicant
PROGRESS RESIDENTIAL BORROWER 9 LLC
Why this is a hauling opportunity: NOC — unclassified description: 18-26-19 | Connector base: 50 | Keyword match: 1 categories (+5) | Stage = permit_issued — actionable now (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-22PASCO_NOC
    Captured Pasco_2026055289 from pasco_noc

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Central State Aggregates LLC · Zephyrhill
One-way
9.1 mi
Round trip
18.3 mi
TypeNameCityOne-wayRT mi
quarryCentral State Aggregates LLCZephyrhill9.1 mi18.3
quarryGeorgia Stone Spring Hill QuarryAtlanta 11.7 mi23.4
sand pitCounty Line MineSpring Hill16.5 mi32.9
quarryTampa Cement Grinding PlantTampa19.7 mi39.4
quarryBrooksville QuarryBrooksville25.0 mi50
quarryBrooksville South Cement PlantBrooksville25.3 mi50.5
quarryWest Florida AggregateWebster27.3 mi54.6
quarryCalcium PlantJacksonville28.6 mi57.2
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
PROGRESS RESIDENTIAL BORROWER 9 LLC
1 active project · Pasco
Contractor
JBC GROUP INC
5 active projects · Hillsborough

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
pasco_nocPasco_20260552892026-05-22Open ↗

Parcel Detail

Property records and ownership

Property
County
Pasco
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/progress-residential-borrower-9-llc-project-18-26-19-pasco-fl-8cea0c55