Leads/powell-kate-project-sarasota-county-sarasota-fl-b54d916c
Approved · unknownSarasota County

POWELL KATE project — Sarasota County

6154 MIDNIGHT PASS RD VILLA 13A

Load estimate pending
Lifecycle
Permitted as of Aug 28, 2025
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

POWELL KATE project — Sarasota County

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor
POWELL KATE
Developer / Applicant
POWELL JOHN
Why this is a hauling opportunity: NOC with no description — unknown scope | Connector base: 50 | Stage = permit_issued — actionable now (+10) | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low | stage=permit_issued, recent (+10) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-22SARASOTA_NOC
    Captured Sarasota_2025128693 from sarasota_noc

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (quarry)
Florida Shell & Fill Company LLC · Naples
One-way
24.8 mi
Round trip
49.5 mi · ~75 min
Rate / load
$175–$230
TypeNameCityOne-wayRT mi~CycleRate / load
quarryFlorida Shell & Fill Company LLCNaples24.8 mi49.5~75m$175–$230
quarryWingate Creek MineLithia30.3 mi60.7~100m$230–$290
quarryCaloosa MaterialsRuskin31.2 mi62.3~100m$230–$290
sand pitWashington Loop MinePunta Gorda41.5 mi83~130m$290–$370
quarry4M-31 MineAlva41.7 mi83.5~130m$290–$370
quarryBermont Materials AlicoPunta Gorda43.2 mi86.3~130m$290–$370
quarrySouth Pasture MineLithia45.0 mi89.9~130m$290–$370
quarryTampa Cement Grinding PlantTampa47.0 mi94.1~130m$290–$370
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

Developer
POWELL JOHN
Contractor
POWELL KATE
1 active project · Sarasota

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Sarasota County Permits
Sarasota / Venice building permit search
ConnectorRecord IDCapturedLink
sarasota_nocSarasota_20251286932026-05-22Open ↗

Parcel Detail

Property records and ownership

Property
County
Sarasota
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/powell-kate-project-sarasota-county-sarasota-fl-b54d916c