Leads/post-hurricane-debris-removal-union-county-fl-union-fl-b8e8d4ef
Approved · unknownUnion County

Post-Hurricane Debris Removal — Union County, FL

Union County, FL

Load estimate pending
Lifecycle
Permitted as of Oct 11, 2024
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

Post-Hurricane Debris Removal — Union County, FL

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 10/11/2024 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

The story

Union County, FL is mobilizing post-hurricane debris removal following Hurricane Milton under FEMA disaster declaration #4834, representing a high-volume demolition and hauling opportunity with permits already issued and work ready to commence. This public works project will require substantial capacity for mixed debris hauling, including construction waste, vegetation, and potentially hazardous materials—critical services in disaster recovery timelines. Key contacts should be sourced through Union County Public Works and FEMA disaster recovery coordinators to secure haul contracts before peak competition peaks.

Why this is a hauling opportunity: FEMA disaster #4834 (Hurricane); declared as 'HURRICANE MILTON' | Connector base: 75 | Keyword match: 1 categories (+5) | Stage = permit_issued — actionable now (+10) | stage=permit_issued, recent (+10) | government/public-authority project (floor 55) | stage=permit_issued, recent (+10) | government/public-authority project (floor 55) | stage=permit_issued, recent (+10) | government/public-authority project (floor 55)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-22FEMA_DISASTERS
    Captured FEMA_4834_UNION from fema_disasters
  2. 2026-05-24FEMA_DISASTERS
    Captured FEMA_3622_UNION from fema_disasters

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
The Chemours Company FC LLC · Starke
One-way
17.2 mi
Round trip
34.3 mi
TypeNameCityOne-wayRT mi
quarryThe Chemours Company FC LLCStarke17.2 mi34.3
sand pitGoldhead Sand PlantJacksonville26.0 mi51.9
quarryLIMESTONE PRODUCTS INCORPORATEDNEWBERRY27.5 mi55.1
quarryNEWBERRY LIMESTONEOcala27.9 mi55.7
quarryNEWBERRY MINE- LIMESTONE MATERIALSOcala28.6 mi57.1
quarryNewberry Cement PlantNewberry30.5 mi61.1
quarrySUWANNEE AMERICAN CEMENTBranford31.0 mi62
quarrySuwannee American CementBranford31.0 mi62
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Union County Permits
Lake Butler Building Department
ConnectorRecord IDCapturedLink
fema_disastersFEMA_4834_UNION2026-05-22Open ↗
fema_disastersFEMA_3622_UNION2026-05-24Open ↗

Parcel Detail

Property records and ownership

Property
County
Union
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/post-hurricane-debris-removal-union-county-fl-union-fl-b8e8d4ef