Leads/post-hurricane-debris-removal-polk-county-fl-polk-fl-f88dab04
Approved · unknownPolk County

Post-Hurricane Debris Removal — Polk County, FL

Polk County, FL

Load estimate pending
Lifecycle
Permitted as of Oct 11, 2024
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

Post-Hurricane Debris Removal — Polk County, FL

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 10/11/2024 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

The story

Post-Hurricane Milton debris removal across Polk County, FL represents an immediate, high-volume hauling opportunity with FEMA disaster declaration #4834 backing the work. This public works project is in permit-issued stage, meaning debris staging, sorting, and final disposal hauling can begin now—expect significant demand for roll-off trucks, heavy haulers, and demolition debris transport. Key contact information for Polk County public works and any assigned debris contractors should be sourced immediately to secure contracts before competitive bidding intensifies.

Why this is a hauling opportunity: FEMA disaster #4834 (Hurricane); declared as 'HURRICANE MILTON' | Connector base: 75 | Keyword match: 1 categories (+5) | Stage = permit_issued — actionable now (+10) | stage=permit_issued, recent (+10) | government/public-authority project (floor 55) | stage=permit_issued, recent (+10) | government/public-authority project (floor 55) | stage=permit_issued, recent (+10) | government/public-authority project (floor 55)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-22FEMA_DISASTERS
    Captured FEMA_4834_POLK from fema_disasters

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Four Corners · Lithia
One-way
12.1 mi
Round trip
24.2 mi
TypeNameCityOne-wayRT mi
quarryFour CornersLithia12.1 mi24.2
quarrySouth Fort Meade MineLithia17.9 mi35.9
quarrySouth Pasture MineLithia18.5 mi37
sand pitDiamond Sand PlantJacksonville20.4 mi40.7
sand pitHaines City MineDavenport20.5 mi41
sand pitLake Wales Dry PlantDavenport20.6 mi41.3
sand pitLake Wales Sand MineBrooksville20.6 mi41.3
sand pitSILICA PLANTDavenport25.2 mi50.4
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Polk County Permits
Lakeland / Winter Haven permit search
ConnectorRecord IDCapturedLink
fema_disastersFEMA_4834_POLK2026-05-22Open ↗

Parcel Detail

Property records and ownership

Property
County
Polk
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/post-hurricane-debris-removal-polk-county-fl-polk-fl-f88dab04