Leads/post-hurricane-debris-removal-columbia-county-fl-columbia-fl-27393f06
Approved · unknownColumbia County

Post-Hurricane Debris Removal — Columbia County, FL

Columbia County, FL

Load estimate pending
Lifecycle
Permitted as of Oct 11, 2024
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

Post-Hurricane Debris Removal — Columbia County, FL

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: FEMA disaster #4834 (Hurricane); declared as 'HURRICANE MILTON' | Connector base: 75 | Keyword match: 1 categories (+5) | Stage = permit_issued — actionable now (+10) | stage=permit_issued, recent (+10) | government/public-authority project (floor 55) | stage=permit_issued, recent (+10) | government/public-authority project (floor 55) | stage=permit_issued, recent (+10) | government/public-authority project (floor 55)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-24FEMA_DISASTERS
    Captured FEMA_4834_COLUMBIA from fema_disasters
  2. 2026-05-24FEMA_DISASTERS
    Captured FEMA_3622_COLUMBIA from fema_disasters

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (quarry)
Ag Lime Gyp Stack · Lake City
One-way
12.8 mi
Round trip
25.7 mi · ~55 min
Rate / load
$140–$175
TypeNameCityOne-wayRT mi~CycleRate / load
quarryAg Lime Gyp StackLake City12.8 mi25.7~55m$140–$175
quarryBeachville MineLive Oak19.8 mi39.7~75m$175–$230
quarrySuwannee American CementBranford20.6 mi41.3~75m$175–$230
quarrySUWANNEE AMERICAN CEMENTBranford20.6 mi41.3~75m$175–$230
quarrySUWANNEE COUNTY PUBLIC WORKSLIVE OAK21.9 mi43.8~75m$175–$230
quarryTOWNSEND PITBell28.2 mi56.4~100m$230–$290
quarryBlue Rok Incorporatedperry33.5 mi67.1~100m$230–$290
quarrySwift Creek MineWhite Springs33.7 mi67.5~100m$230–$290
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Columbia County Permits
Lake City Building & Code Compliance
ConnectorRecord IDCapturedLink
fema_disastersFEMA_4834_COLUMBIA2026-05-24Open ↗
fema_disastersFEMA_3622_COLUMBIA2026-05-24Open ↗

Parcel Detail

Property records and ownership

Property
County
Columbia
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/post-hurricane-debris-removal-columbia-county-fl-columbia-fl-27393f06