Leads/pedestrian-bridge-constgruction-fl-3f2f5ec8
Approved · unknown

PEDESTRIAN BRIDGE CONSTGRUCTION

UNKNOWN, BRADENTON, FL, 34205

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

PEDESTRIAN BRIDGE CONSTGRUCTION

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
PEDESTRIAN BRIDGE CONSTGRUCTION
Why this is a hauling opportunity: Base site_development/stormwater (40) | roadway/highway keywords (+25)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21NPDES_STORMWATER
    Captured FLR20AR02 from npdes_stormwater

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (landfill)
63RD AVENUE EAST WASTE PROCESSING FACILITY · Bradenton
One-way
4.9 mi
Round trip
9.8 mi
Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
16.4 mi
Round trip
32.9 mi
TypeNameCityOne-wayRT mi
quarryCaloosa MaterialsRuskin16.4 mi32.9
quarryWingate Creek MineLithia27.6 mi55.2
quarryTampa Cement Grinding PlantTampa31.4 mi62.7
quarrySouth Pasture MineLithia39.7 mi79.4
quarryFlorida Shell & Fill Company LLCNaples40.6 mi81.2
quarryFour CornersLithia41.3 mi82.5
quarry4M-31 MineAlva48.0 mi96
landfill63RD AVENUE EAST WASTE PROCESSING FACILITYBradenton4.9 mi9.8
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
PEDESTRIAN BRIDGE CONSTGRUCTION

Permits & Sources

Every connector that's seen this project

ACTIVEStormwater Construction Notice (NPDES)(NPDES Construction General Permit (CGP))

Filed days before land disturbance begins on sites over 1 acre. One of the strongest 'trucks imminent' signals there is.

ConnectorRecord IDCapturedLink
npdes_stormwaterFLR20AR022026-05-21Open ↗

Parcel Detail

Property records and ownership

Property
City
BRADENTON
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/pedestrian-bridge-constgruction-fl-3f2f5ec8