QUALITY LABOR SOURCE LLC project — 13-26-19
13-26-19
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-21PASCO_NOCCaptured Pasco_2025225978 from pasco_noc
- 2026-05-21PASCO_NOCCaptured Pasco_2026015910 from pasco_noc
- 2026-05-28FL_DOR_CADASTRALCaptured FDOR_13-26-19-0070-00000-00A0_077a4bd8 from fl_dor_cadastral
- 2026-05-28FL_DOR_CADASTRALCaptured FDOR_13-26-19-0070-00000-00A0_6e3b3e73 from fl_dor_cadastral
- 2026-06-08PASCOPACaptured PASCOPA_13-26-19-0070-00000-00A0_077a4bd8 from pascopa
- 2026-06-08PASCOPACaptured PASCOPA_13-26-19-0070-00000-00A0_6e3b3e73 from pascopa
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Central State Aggregates LLC | Zephyrhill | 4.2 mi | 8.4 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 13.8 mi | 27.6 |
| sand pit | County Line Mine | Spring Hill | 19.3 mi | 38.6 |
| quarry | Tampa Cement Grinding Plant | Tampa | 20.3 mi | 40.6 |
| quarry | West Florida Aggregate | Webster | 24.1 mi | 48.2 |
| quarry | Brooksville Quarry | Brooksville | 25.5 mi | 50.9 |
| quarry | Brooksville South Cement Plant | Brooksville | 25.5 mi | 51.1 |
| quarry | Calcium Plant | Jacksonville | 28.9 mi | 57.7 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| pasco_noc | Pasco_2025225978 | 2026-05-21 | Open ↗ |
| pasco_noc | Pasco_2026015910 | 2026-05-21 | Open ↗ |
| fl_dor_cadastral | FDOR_13-26-19-0070-00000-00A0_077a4bd8 | 2026-05-28 | Open ↗ |
| fl_dor_cadastral | FDOR_13-26-19-0070-00000-00A0_6e3b3e73 | 2026-05-28 | Open ↗ |
| pascopa | PASCOPA_13-26-19-0070-00000-00A0_077a4bd8 | 2026-06-08 | Open ↗ |
| pascopa | PASCOPA_13-26-19-0070-00000-00A0_6e3b3e73 | 2026-06-08 | Open ↗ |
Parcel Detail
Pasco County Property Appraiser
- Folio
- 13-26-19-0070-00000-00A0
- Strap
- 13-26-19-0070-00000-00A0
- Address
- Acreage
- 4.2 ac
- Sq ft
- 182,952
No sale on record
- Just (market)
- $0
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/park-sanghoon-project-13-26-19-pasco-fl-cffef947