Leads/paradise-pointe-charlotte-harbor-charlotte-fl-807f0061
Approved · unknownCharlotte County

PARADISE POINTE@CHARLOTTE HARBOR

1425 PARK BEACH CIR, PUNTA GORDA, FL, 33950-5209

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

PARADISE POINTE@CHARLOTTE HARBOR

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
PARADISE POINTE@CHARLOTTE HARBOR
Why this is a hauling opportunity: Base site_development/stormwater (40)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21NPDES_STORMWATER
    Captured FLR10SI99 from npdes_stormwater

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (sand pit)
Washington Loop Mine · Punta Gorda
One-way
7.8 mi
Round trip
15.5 mi
TypeNameCityOne-wayRT mi
sand pitWashington Loop MinePunta Gorda7.8 mi15.5
quarryBermont Materials AlicoPunta Gorda8.4 mi16.8
quarryFlorida Shell & Fill Company LLCNaples17.5 mi34.9
quarryHalls MineNaples17.9 mi35.8
quarryHighlands County Shell PitSebring19.5 mi39.1
quarryWright Farms PitNocatee19.7 mi39.4
sand pitWatermelon PitPunta Gorda19.8 mi39.6
sand pitWillliams Farms Sand & Shell, Inc.PUNTA GORDA19.9 mi39.7
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
PARADISE POINTE@CHARLOTTE HARBOR

Permits & Sources

Every connector that's seen this project

ACTIVEStormwater Construction Notice (NPDES)(NPDES Construction General Permit (CGP))

Filed days before land disturbance begins on sites over 1 acre. One of the strongest 'trucks imminent' signals there is.

Official source-of-truth portal
Charlotte County Permits
Port Charlotte Building Construction
ConnectorRecord IDCapturedLink
npdes_stormwaterFLR10SI992026-05-21Open ↗

Parcel Detail

Property records and ownership

Property
County
Charlotte
City
PUNTA GORDA
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/paradise-pointe-charlotte-harbor-charlotte-fl-807f0061