PACE CENTER FOR GIRLS BRADENTON
3508 26TH ST W, BRADENTON, FL, 34205-3502
- Filed
- Permitted
- Active
- Completed
Construction underway — hauling demand peaks here
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Not yet identified
The PACE Center for Girls Bradenton is a site development project focused on stormwater management, currently under construction at 3508 26th St W, Bradenton, FL. This project presents significant hauling opportunities due to its active construction phase and earthwork requirements, which indicate a robust demand for materials and excavation services. Key contacts include the PACE Center for Girls Bradenton, the owner-developer overseeing the project, making outreach crucial for hauling providers looking to engage in this timely opportunity.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-21NPDES_STORMWATERCaptured FLR20HT72 from npdes_stormwater
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Caloosa Materials | Ruskin | 18.5 mi | 37 |
| quarry | Wingate Creek Mine | Lithia | 28.6 mi | 57.1 |
| quarry | Tampa Cement Grinding Plant | Tampa | 33.4 mi | 66.8 |
| quarry | Florida Shell & Fill Company LLC | Naples | 39.2 mi | 78.4 |
| quarry | South Pasture Mine | Lithia | 41.1 mi | 82.2 |
| quarry | Four Corners | Lithia | 42.9 mi | 85.8 |
| quarry | 4M-31 Mine | Alva | 48.1 mi | 96.2 |
| landfill | 63RD AVENUE EAST WASTE PROCESSING FACILITY | Bradenton | 3.9 mi | 7.8 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Filed days before land disturbance begins on sites over 1 acre. One of the strongest 'trucks imminent' signals there is.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| npdes_stormwater | FLR20HT72 | 2026-05-21 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Manatee
- City
- BRADENTON
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/pace-center-for-girls-bradenton-manatee-fl-5ff47c85