MK CONSTRUCTION GROUP LLC project — Sarasota County
5662 COUNTRY LAKES DR
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
MK Construction Group LLC has secured permits for a site development project at 5662 Country Lakes Drive in Sarasota County focused on earthwork operations, signaling an imminent start with immediate material movement needs. This represents a strong hauling opportunity (75/100 score) for excavation spoil removal, fill delivery, and site prep material transport as the project transitions from permitting to active construction. Contact MK Construction Group LLC directly as prime GC, with owner Peter Sciocchetti as secondary stakeholder—timing is optimal given the permit-issued stage.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-22SARASOTA_NOCCaptured Sarasota_2025082119 from sarasota_noc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Caloosa Materials | Ruskin | 19.6 mi | 39.2 |
| quarry | Wingate Creek Mine | Lithia | 23.1 mi | 46.3 |
| quarry | Florida Shell & Fill Company LLC | Naples | 34.2 mi | 68.4 |
| quarry | Tampa Cement Grinding Plant | Tampa | 35.6 mi | 71.1 |
| quarry | South Pasture Mine | Lithia | 36.7 mi | 73.3 |
| quarry | Four Corners | Lithia | 39.6 mi | 79.2 |
| quarry | 4M-31 Mine | Alva | 41.4 mi | 82.7 |
| sand pit | Washington Loop Mine | Punta Gorda | 45.8 mi | 91.5 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| sarasota_noc | Sarasota_2025082119 | 2026-05-22 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Sarasota
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/mk-construction-group-llc-project-sarasota-county-sarasota-fl-e41b1d41