Leads/lullwater-leon-fl-0c9f12a0
Approved · unknownLeon County

LULLWATER

3501 BLAIRSTONE RD, TALLAHASSEE, FL, 32301-6981

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

LULLWATER

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant
LULLWATER
Why this is a hauling opportunity: Base site_development/stormwater (40) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21NPDES_STORMWATER
    Captured FLR10RO95 from npdes_stormwater

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest export sink (landfill)
CROWDER RECYCLING TRAM · Tallahassee
One-way
2.2 mi
Round trip
4.4 mi · ~25 min
Rate / load
$85–$110
Closest import source (sand pit)
Silver Lake 1 · Tallahassee
One-way
10.5 mi
Round trip
21 mi · ~55 min
Rate / load
$140–$175
TypeNameCityOne-wayRT mi~CycleRate / load
sand pitSilver Lake 1Tallahassee10.5 mi21~55m$140–$175
quarryActive Minerals Attapulgite DivisionQuincy23.8 mi47.6~75m$175–$230
quarryQuincy Plant and MinesQUINCY23.9 mi47.8~75m$175–$230
quarryCYD Cabbage GroveDaytona Beach24.1 mi48.2~75m$175–$230
quarryPerry QuarryFort Myers24.3 mi48.6~75m$175–$230
sand pitA-Mining Group II LLC.Quincy24.8 mi49.6~75m$175–$230
quarrySRM Materials Cabbage GroveLamont43.9 mi87.9~130m$290–$370
landfillCROWDER RECYCLING TRAMTallahassee2.2 mi4.4~25m$85–$110
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

Developer
LULLWATER

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Leon County Permits
Tallahassee area Building Services
ConnectorRecord IDCapturedLink
npdes_stormwaterFLR10RO952026-05-21Open ↗

Parcel Detail

Property records and ownership

Property
County
Leon
City
TALLAHASSEE
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/lullwater-leon-fl-0c9f12a0