NOC – Valerie Pyles | 1RE Foundation Repair LLC - Frank Vitale | 1017 W Prenslow
1017 W Prenslow, Tampa, FL 33603
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
The project at 1017 W Prenslow in Tampa, FL, involves site development focusing on earthwork, with the permit already issued, signaling imminent activity. This opportunity is crucial for hauling providers as it will require substantial movement of dirt and materials for foundation repair. Key contacts include Frank Vitale from LRE Foundation Repair, the general contractor, and owner/developer Valerie Pyles, who can provide further details on hauling needs and logistics.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-21OFFICIAL_RECORDS_NOCCaptured Hillsborough_2025355387 from official_records_noc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Tampa Cement Grinding Plant | Tampa | 4.2 mi | 8.3 |
| quarry | Central State Aggregates LLC | Zephyrhill | 17.4 mi | 34.8 |
| quarry | Caloosa Materials | Ruskin | 20.2 mi | 40.4 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 27.1 mi | 54.2 |
| sand pit | County Line Mine | Spring Hill | 31.0 mi | 62 |
| quarry | Four Corners | Lithia | 33.6 mi | 67.3 |
| quarry | South Pasture Mine | Lithia | 39.3 mi | 78.6 |
| quarry | Wingate Creek Mine | Lithia | 39.8 mi | 79.6 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| official_records_noc | Hillsborough_2025355387 | 2026-05-21 | Open ↗ |
Parcel Detail
Property records and ownership
- Parcel ID
- 167860-0000
- County
- Hillsborough
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/lre-foundation-repair-llc-project-see-image-hillsborough-fl-138a7c15