Leads/lihtc-water-oak-volusia-fl-9b6f63c4
Approved · unknownVolusia County

LIHTC — WATER OAK

315 WATER OAK CIR, ORANGE CITY, FL, 32763

Load estimate pending
Lifecycle
Permitted as of Jan 1, 1989
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

LIHTC — WATER OAK

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base mixed_use/vertical_build (40) | stage=permit_issued, but stale (37y old)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28HUD_LIHTC
    Captured HUD_LIHTC_FLA00000730 from hud_lihtc

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (sand pit)
Lisbon Sand · Lexington
One-way
28.9 mi
Round trip
57.8 mi · ~100 min
Rate / load
$230–$290
TypeNameCityOne-wayRT mi~CycleRate / load
sand pitLisbon SandLexington28.9 mi57.8~100m$230–$290
sand pitAstatula Sand PlantJacksonville30.8 mi61.7~100m$230–$290
sand pitWeirsdale Sand PlantJacksonville34.3 mi68.7~100m$230–$290
quarryBeeline MineOrlando34.5 mi68.9~100m$230–$290
quarryS & L Materials IncKISSIMMEE36.2 mi72.3~100m$230–$290
sand pitIndependent MineDavenport37.7 mi75.3~100m$230–$290
sand pitCenter Sand CompanyClermont37.8 mi75.6~100m$230–$290
sand pitOkahumpkaLeesburg38.3 mi76.7~100m$230–$290
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Volusia County Permits
Daytona / DeLand Building & Zoning
ConnectorRecord IDCapturedLink
hud_lihtcHUD_LIHTC_FLA000007302026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
Volusia
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/lihtc-water-oak-volusia-fl-9b6f63c4