LIHTC — OCHLOKONEE POINTE
33870 BLUE STAR HWY, MIDWAY, FL, 32343
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
The permit cleared on 1/1/2006 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.
Not yet identified
Not yet identified
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-28HUD_LIHTCCaptured HUD_LIHTC_FLA20060801 from hud_lihtc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| sand pit | Silver Lake 1 | Tallahassee | 4.1 mi | 8.3 |
| quarry | Active Minerals Attapulgite Division | Quincy | 12.3 mi | 24.5 |
| quarry | Quincy Plant and Mines | QUINCY | 12.5 mi | 25.1 |
| sand pit | A-Mining Group II LLC. | Quincy | 14.0 mi | 28.1 |
| quarry | CYD Cabbage Grove | Daytona Beach | 35.2 mi | 70.3 |
| quarry | Perry Quarry | Fort Myers | 35.4 mi | 70.9 |
| quarry | 1874 Marianna | Hammond | 46.1 mi | 92.2 |
| quarry | ROCKY CREEK MINE AND MILL | Marianna | 46.7 mi | 93.5 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| hud_lihtc | HUD_LIHTC_FLA20060801 | 2026-05-28 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Gadsden
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/lihtc-ochlokonee-pointe-gadsden-fl-d444a8f3