Leads/lihtc-janie-s-garden-i-sarasota-fl-4e01833a
Approved · unknownSarasota County

LIHTC — JANIE'S GARDEN I

2350 CENTRAL AVE, SARASOTA, FL, 34234

Load estimate pending
Lifecycle
Permitted as of Jan 1, 2009
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

LIHTC — JANIE'S GARDEN I

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 1/1/2009 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
$1.2M
Actual — from source record
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base mixed_use/vertical_build (40) | size signal: $1,155,000 valuation (+12) | stage=permit_issued, but stale (17y old)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28HUD_LIHTC
    Captured HUD_LIHTC_FLA20090050 from hud_lihtc

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
24.6 mi
Round trip
49.1 mi
TypeNameCityOne-wayRT mi
quarryCaloosa MaterialsRuskin24.6 mi49.1
quarryWingate Creek MineLithia27.5 mi54.9
quarryFlorida Shell & Fill Company LLCNaples31.0 mi62.1
quarryTampa Cement Grinding PlantTampa40.3 mi80.6
quarrySouth Pasture MineLithia41.5 mi83
quarry4M-31 MineAlva43.1 mi86.2
quarryFour CornersLithia44.8 mi89.6
sand pitWashington Loop MinePunta Gorda45.4 mi90.8
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Sarasota County Permits
Sarasota / Venice building permit search
ConnectorRecord IDCapturedLink
hud_lihtcHUD_LIHTC_FLA200900502026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
Sarasota
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/lihtc-janie-s-garden-i-sarasota-fl-4e01833a