Leads/lihtc-eden-park-at-ironwood-alachua-fl-bcf41592
Approved · unknownAlachua County

LIHTC — EDEN PARK AT IRONWOOD

1330 NE 39TH AVE, GAINESVILLE, FL, 32609

Load estimate pending
Lifecycle
Permitted as of Jan 1, 2004
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

LIHTC — EDEN PARK AT IRONWOOD

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Base mixed_use/vertical_build (40) | stage=permit_issued, but stale (22y old)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28HUD_LIHTC
    Captured HUD_LIHTC_FLA20040080 from hud_lihtc

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (quarry)
NEWBERRY LIMESTONE · Ocala
One-way
15.0 mi
Round trip
30.1 mi · ~75 min
Rate / load
$175–$230
TypeNameCityOne-wayRT mi~CycleRate / load
quarryNEWBERRY LIMESTONEOcala15.0 mi30.1~75m$175–$230
quarryNEWBERRY MINE- LIMESTONE MATERIALSOcala16.1 mi32.1~75m$175–$230
quarryLIMESTONE PRODUCTS INCORPORATEDNEWBERRY16.3 mi32.5~75m$175–$230
quarryNewberry Cement PlantNewberry18.1 mi36.3~75m$175–$230
quarryRALEIGH QUARRYWILLISTON20.4 mi40.8~75m$175–$230
quarryOcala QuarryAtlanta 22.1 mi44.3~75m$175–$230
quarryThe Chemours Company FC LLCStarke22.4 mi44.8~75m$175–$230
sand pitGoldhead Sand PlantJacksonville22.5 mi45.1~75m$175–$230
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Alachua County Permits
Gainesville area Building Permits
ConnectorRecord IDCapturedLink
hud_lihtcHUD_LIHTC_FLA200400802026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
Alachua
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/lihtc-eden-park-at-ironwood-alachua-fl-bcf41592