UNLIMITED RESTORATION INC project — 26-26-21
26-26-21
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-21PASCO_NOCCaptured Pasco_2026005836 from pasco_noc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Central State Aggregates LLC | Zephyrhill | 7.1 mi | 14.2 |
| quarry | West Florida Aggregate | Webster | 21.8 mi | 43.6 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 23.1 mi | 46.2 |
| quarry | Tampa Cement Grinding Plant | Tampa | 23.9 mi | 47.8 |
| sand pit | 474 Sand Mine | Brooksville | 28.7 mi | 57.3 |
| sand pit | County Line Mine | Spring Hill | 28.9 mi | 57.8 |
| sand pit | Green Bay Mine | Davenport | 29.5 mi | 59 |
| quarry | Mid-Coast Aggregates LLC-Mazak Mine | Webster | 30.0 mi | 59.9 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| pasco_noc | Pasco_2026005836 | 2026-05-21 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Pasco
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/lara-miguel-h-project-26-26-21-pasco-fl-d6317267