KODE CONSTRUCTION SERVICES LLC project — 32-25-16
32-25-16
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
KODE Construction Services LLC is managing earthwork and site development for a project in the 32-25-16 area owned by JJS Properties of Florida LLC, with permit issuance now unlocking immediate activity. This represents a strong hauling opportunity (75/100 score) for bulk earth movement, fill material delivery, and site preparation services during the active development phase. Contact KODE Construction Services as the prime GC to position for excavation debris removal, soil/aggregate delivery, and general site material handling needs.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-22PASCO_NOCCaptured Pasco_2026046142 from pasco_noc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| sand pit | County Line Mine | Spring Hill | 14.9 mi | 29.8 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 16.6 mi | 33.1 |
| quarry | Central State Aggregates LLC | Zephyrhill | 26.5 mi | 52.9 |
| quarry | Brooksville Quarry | Brooksville | 27.9 mi | 55.7 |
| quarry | Tampa Cement Grinding Plant | Tampa | 28.5 mi | 57 |
| quarry | Brooksville South Cement Plant | Brooksville | 28.7 mi | 57.4 |
| quarry | Calcium Plant | Jacksonville | 31.3 mi | 62.6 |
| quarry | Center Hill Mine | Brooksville | 35.3 mi | 70.5 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| pasco_noc | Pasco_2026046142 | 2026-05-22 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Pasco
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/kode-construction-services-llc-project-32-25-16-pasco-fl-c91fc7fe