Leads/jk-r-construction-inc-project-14-26-19-pasco-fl-60c10fa4
Approved · unknownPasco County

JK&R CONSTRUCTION INC project — 14-26-19

14-26-19

Load estimate pending
Lifecycle
Permitted as of Apr 17, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

JK&R CONSTRUCTION INC project — 14-26-19

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
JK&R CONSTRUCTION INC
Developer / Applicant
JACKSON JULIE
The story

JK&R Construction Inc is undertaking a site development earthwork project at 14-26-19 with permits now issued, indicating active mobilization is imminent. This represents a strong hauling opportunity requiring material haul-off, fill transportation, and site preparation services typical of earthwork-heavy development. Contact prime GC JK&R Construction Inc directly—the project's high 75/100 hauling score and permit stage mean bidding windows are open now for immediate work engagement.

Why this is a hauling opportunity: General contractor NOC: JK&R CONSTRUCTION INC | Connector base: 65 | Stage = permit_issued — actionable now (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-22PASCO_NOC
    Captured Pasco_2026070946 from pasco_noc

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Central State Aggregates LLC · Zephyrhill
One-way
5.2 mi
Round trip
10.3 mi
TypeNameCityOne-wayRT mi
quarryCentral State Aggregates LLCZephyrhill5.2 mi10.3
quarryGeorgia Stone Spring Hill QuarryAtlanta 13.3 mi26.5
sand pitCounty Line MineSpring Hill18.7 mi37.3
quarryTampa Cement Grinding PlantTampa20.1 mi40.2
quarryWest Florida AggregateWebster24.7 mi49.3
quarryBrooksville QuarryBrooksville25.3 mi50.6
quarryBrooksville South Cement PlantBrooksville25.4 mi50.8
quarryCalcium PlantJacksonville28.7 mi57.5
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
JACKSON JULIE
Contractor
JK&R CONSTRUCTION INC
1 active project · Pasco

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
pasco_nocPasco_20260709462026-05-22Open ↗

Parcel Detail

Property records and ownership

Property
County
Pasco
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/jk-r-construction-inc-project-14-26-19-pasco-fl-60c10fa4