Leads/ivanhoe-plaza-park-stormwater-improvements-orange-fl-da86f504
Approved · unknownOrange County

IVANHOE PLAZA PARK STORMWATER IMPROVEMENTS

500 SHADY LANE DR, ORLANDO, FL, 32801

Load estimate pending
Lifecycle
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Job closed — historical reference only

Location

The workspace from above — satellite by default

IVANHOE PLAZA PARK STORMWATER IMPROVEMENTS

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant
IVANHOE PLAZA PARK STORMWATER IMPROVEMENTS
Why this is a hauling opportunity: Base site_development/stormwater (40) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21NPDES_STORMWATER
    Captured FLR10LI95 from npdes_stormwater

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (sand pit)
Center Sand Company · Clermont
One-way
18.7 mi
Round trip
37.4 mi · ~75 min
Rate / load
$175–$230
TypeNameCityOne-wayRT mi~CycleRate / load
sand pitCenter Sand CompanyClermont18.7 mi37.4~75m$175–$230
sand pitIndependent MineDavenport19.3 mi38.7~75m$175–$230
sand pitFour Corners Sand MineBrooksville19.9 mi39.8~75m$175–$230
sand pitAstatula Sand PlantJacksonville23.1 mi46.1~75m$175–$230
quarryS & L Materials IncKISSIMMEE23.2 mi46.5~75m$175–$230
sand pitHilochee Sand MineDavenport23.3 mi46.5~75m$175–$230
quarryBeeline MineOrlando24.1 mi48.2~75m$175–$230
sand pitLake Sand PlantJacksonville24.4 mi48.9~75m$175–$230
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

Developer
IVANHOE PLAZA PARK STORMWATER IMPROVEMENTS

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Orange County Permits
Orlando area building permit search
ConnectorRecord IDCapturedLink
npdes_stormwaterFLR10LI952026-05-21Open ↗

Parcel Detail

Property records and ownership

Property
County
Orange
City
ORLANDO
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/ivanhoe-plaza-park-stormwater-improvements-orange-fl-da86f504