NOC – Ismael Pacheco | Humberto Leon HLR Construction LLC | 1611 58TH St
1611 58TH St, Tampa, FL 33619
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Humberto Leon HLR Construction is executing earthwork and site development at 1611 58th St in Tampa with a permit-issued NOC filing, indicating active project mobilization. This project presents solid hauling demand for excavation spoil, fill materials, and debris removal typical of site prep work. Contact GC Humberto Leon HLR Construction directly—the permit status and 75/100 hauling score suggest near-term material movement opportunity.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-21OFFICIAL_RECORDS_NOCCaptured Hillsborough_2026194900 from official_records_noc
- 2026-05-22HCPACaptured HCPA_0463080000_dc445d48 from hcpa
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Tampa Cement Grinding Plant | Tampa | 3.2 mi | 6.4 |
| quarry | Caloosa Materials | Ruskin | 16.1 mi | 32.3 |
| quarry | Central State Aggregates LLC | Zephyrhill | 19.6 mi | 39.2 |
| quarry | Four Corners | Lithia | 28.1 mi | 56.2 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 31.9 mi | 63.8 |
| quarry | South Pasture Mine | Lithia | 33.5 mi | 67 |
| quarry | Wingate Creek Mine | Lithia | 34.1 mi | 68.2 |
| sand pit | County Line Mine | Spring Hill | 36.2 mi | 72.5 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| official_records_noc | Hillsborough_2026194900 | 2026-05-21 | Open ↗ |
| hcpa | HCPA_0463080000_dc445d48 | 2026-05-22 | Open ↗ |
Parcel Detail
Hillsborough Property Appraiser
- Folio
- 0463080000
- Strap
- U-27-29-19-663-000001-57760.0
- Address
- 1611 S 58TH ST, TAMPA
- Zip
- 33619
- Acreage
- 0.078 ac
- Sq ft
- 3,401
- Homestead
- NO
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/humberto-leon-hlr-construction-llc-project-hillsborough-county-hillsborough-fl-8c1a30e0