Leads/hersch-blake-project-03-26-21-pasco-fl-5fafbc5c
Approved · unknownPasco County

QUALITY CRAFTSMEN LLC project — 03-26-21

03-26-21

~842loads
fill dirt + base rock
6 wk
Lifecycle
Permitted as of May 4, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

QUALITY CRAFTSMEN LLC project — 03-26-21

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
$6K
Actual — from source record
Acreage
6.06 ac
Parcel 03-26-21-0000-49900-00B0
Est truck loads
Needs site plan parse
Sources seen
9
Public records referencing this job
General Contractor
QUALITY CRAFTSMEN, LLC
📞 (407) 307-3137
Developer / Applicant
HERSCH BLAKE
Why this is a hauling opportunity: NOC — unclassified description: 03-26-21 | Connector base: 50 | Stage = permit_issued — actionable now (+10) | size signal: 6.1 ac disturbed, ~842 est. loads (+20) | stage=permit_issued, recent (+10) | size signal: 6.1 ac disturbed, ~842 est. loads (+20) | stage=permit_issued, recent (+10) | size signal: 6.1 ac disturbed, ~842 est. loads (+20) | stage=permit_issued, recent (+10) | size signal: 6.1 ac disturbed, ~842 est. loads (+20) | stage=permit_issued, recent (+10)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21PASCO_NOC
    Captured Pasco_2026082607 from pasco_noc
  2. 2026-05-21PASCO_NOC
    Captured Pasco_2026064257 from pasco_noc
  3. 2026-05-22PASCO_NOC
    Captured Pasco_2026035016 from pasco_noc
  4. 2026-05-28FL_DOR_CADASTRAL
    Captured FDOR_03-26-21-0000-49900-00B0_34e63d54 from fl_dor_cadastral
  5. 2026-05-28FL_DOR_CADASTRAL
    Captured FDOR_03-26-21-0000-49900-00B0_190f1ce8 from fl_dor_cadastral
  6. 2026-06-01PASCOPA
    Captured PASCOPA_03-26-21-0000-49900-00B0_34e63d54 from pascopa
  7. 2026-06-08PASCOPA
    Captured PASCOPA_03-26-21-0000-49900-00B0_190f1ce8 from pascopa
  8. 2026-07-03FL_DOR_CADASTRAL
    Captured FDOR_03-26-21-0000-49900-00B0_00e83e37 from fl_dor_cadastral
  9. 2026-07-06PASCOPA
    Captured PASCOPA_03-26-21-0000-49900-00B0_00e83e37 from pascopa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Central State Aggregates LLC · Zephyrhill
One-way
6.9 mi
Round trip
13.7 mi
TypeNameCityOne-wayRT mi
quarryCentral State Aggregates LLCZephyrhill6.9 mi13.7
quarryWest Florida AggregateWebster18.0 mi36.1
quarryGeorgia Stone Spring Hill QuarryAtlanta 20.1 mi40.3
sand pitCounty Line MineSpring Hill25.9 mi51.9
quarryTampa Cement Grinding PlantTampa26.4 mi52.9
quarryMid-Coast Aggregates LLC-Mazak MineWebster26.8 mi53.6
quarryBrooksville South Cement PlantBrooksville27.1 mi54.1
quarryBrooksville QuarryBrooksville27.4 mi54.8
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
HERSCH BLAKE
1 active project · Pasco
~842 est. loads · fill dirt
Contractor
QUALITY CRAFTSMEN, LLC
9 active projects · Pasco
~4,360 est. loads · fill dirt
📞 (407) 307-3137

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Pasco County Permits
New Port Richey / Wesley Chapel Building
ConnectorRecord IDCapturedLink
pasco_nocPasco_20260826072026-05-21Open ↗
pasco_nocPasco_20260642572026-05-21Open ↗
pasco_nocPasco_20260350162026-05-22Open ↗
fl_dor_cadastralFDOR_03-26-21-0000-49900-00B0_34e63d542026-05-28Open ↗
fl_dor_cadastralFDOR_03-26-21-0000-49900-00B0_190f1ce82026-05-28Open ↗
pascopaPASCOPA_03-26-21-0000-49900-00B0_34e63d542026-06-01Open ↗
pascopaPASCOPA_03-26-21-0000-49900-00B0_190f1ce82026-06-08Open ↗
fl_dor_cadastralFDOR_03-26-21-0000-49900-00B0_00e83e372026-07-03Open ↗
pascopaPASCOPA_03-26-21-0000-49900-00B0_00e83e372026-07-06Open ↗

Parcel Detail

Pasco County Property Appraiser

PropertyPASCOPA
Folio
03-26-21-0000-49900-00B0
Strap
03-26-21-0000-49900-00B0
Address
Acreage
6.06 ac
Sq ft
263,974
Owner of record
PASCO COUNTY
C/O FACILITIES MANAGEMENT DEPARTMENT
Last sale

No sale on record

Appraiser valuation
Just (market)
$6,060

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/hersch-blake-project-03-26-21-pasco-fl-5fafbc5c