HAZLEGROVE CONSTRUCTION project — 21-25-16
21-25-16
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
Hazlegrove Construction is beginning earthwork operations on a site development project at 21-25-16 with permits now issued, making this an immediate opportunity for hauling providers. The project requires significant material movement and soil handling typical of site prep work, with strong potential for ongoing haul services throughout the earthwork phase. Primary contact is Hazlegrove Construction (prime GC) with QUOC LAM HUNG as the owner-developer—reach out now while mobilization is underway.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-21PASCO_NOCCaptured Pasco_2026081436 from pasco_noc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| sand pit | County Line Mine | Spring Hill | 12.7 mi | 25.5 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 14.7 mi | 29.5 |
| quarry | Brooksville Quarry | Brooksville | 25.7 mi | 51.4 |
| quarry | Central State Aggregates LLC | Zephyrhill | 25.9 mi | 51.7 |
| quarry | Brooksville South Cement Plant | Brooksville | 26.5 mi | 53 |
| quarry | Calcium Plant | Jacksonville | 29.1 mi | 58.2 |
| quarry | Tampa Cement Grinding Plant | Tampa | 29.6 mi | 59.1 |
| quarry | Center Hill Mine | Brooksville | 33.1 mi | 66.2 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| pasco_noc | Pasco_2026081436 | 2026-05-21 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Pasco
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/hazlegrove-construction-project-21-25-16-pasco-fl-ba8d25f4