HANSEN MARINE CONSTRUCTION project — 03-25-20
03-25-20
- Filed
- Permitted
- Active
- Completed
Approved / NOC filed / permit issued — ready to break ground
Location
The workspace from above — satellite by default
My Pipeline
Tag this lead — private to you, builds your bid history over time
Summary
Key numbers at a glance
**HANSEN MARINE CONSTRUCTION Site Development Project** This is an earthwork-focused site development project at permit stage with Q TERRA HOLDINGS as owner and HANSEN MARINE CONSTRUCTION as prime GC, representing an active hauling opportunity (75/100 score) for soil, fill, and excavation material transport. With permits issued, the project is actionable now—contact HANSEN MARINE CONSTRUCTION to secure earthwork hauling contracts for the initial site prep phase.
Lifecycle Timeline
Every signal we've seen, in order
- 2026-05-21PASCO_NOCCaptured Pasco_2026078123 from pasco_noc
Hauling Demand Estimator
Cut/fill volumes, drainage, and utility trenches from the site plan
Material Sourcing
Nearest pits, quarries, landfills, and transfer stations
| Type | Name | City | One-way | RT mi |
|---|---|---|---|---|
| quarry | Central State Aggregates LLC | Zephyrhill | 9.3 mi | 18.5 |
| quarry | Georgia Stone Spring Hill Quarry | Atlanta | 12.3 mi | 24.5 |
| quarry | West Florida Aggregate | Webster | 15.2 mi | 30.4 |
| sand pit | County Line Mine | Spring Hill | 17.9 mi | 35.8 |
| quarry | Brooksville South Cement Plant | Brooksville | 18.9 mi | 37.8 |
| quarry | Brooksville Quarry | Brooksville | 19.1 mi | 38.3 |
| quarry | Center Hill Mine | Brooksville | 21.5 mi | 43.1 |
| quarry | Calcium Plant | Jacksonville | 22.0 mi | 44 |
| See /material-sources for the full directory. | ||||
Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.
Contact Graph
Who's involved and how
Permits & Sources
Every connector that's seen this project
Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.
| Connector | Record ID | Captured | Link |
|---|---|---|---|
| pasco_noc | Pasco_2026078123 | 2026-05-21 | Open ↗ |
Parcel Detail
Property records and ownership
- County
- Pasco
Site Plan & Engineering
Linked documents
Bid Data
Who bid, who won
Activity & Notes
Your internal log
/leads/hansen-marine-construction-project-03-25-20-pasco-fl-68b1de1f