Leads/full-system-install-equal-exchange-1021-new-winsor-loop-sun-city-center-hillsbor-efa4099f
Approved · unknownHillsborough County

Full system install Equal Exchange — 1021 New Winsor Loop Sun City Center

1021 New Winsor Loop Sun City Center, Florida 33573

Load estimate pending
Lifecycle
Permitted as of Feb 24, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

Full system install Equal Exchange — 1021 New Winsor Loop Sun City Center

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Parcel 057474-3086
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
Three Guys A/C & Electric
Developer / Applicant
Wade Crowley
Why this is a hauling opportunity: Low hauling relevance: Full system install Equal Exchange | stage=permit_issued, recent (+10) | single-trade residential permit — capped low | government/public-authority project (floor 55)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-07-02OFFICIAL_RECORDS_NOC
    Captured Hillsborough_2026071024 from official_records_noc

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
4.3 mi
Round trip
8.6 mi
TypeNameCityOne-wayRT mi
quarryCaloosa MaterialsRuskin4.3 mi8.6
quarryTampa Cement Grinding PlantTampa17.1 mi34.2
quarryWingate Creek MineLithia20.4 mi40.8
quarryFour CornersLithia24.9 mi49.7
quarrySouth Pasture MineLithia26.1 mi52.2
quarryCentral State Aggregates LLCZephyrhill35.3 mi70.6
quarrySouth Fort Meade MineLithia37.8 mi75.6
quarry4M-31 MineAlva45.9 mi91.8
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
Wade Crowley
Contractor
Three Guys A/C & Electric

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Hillsborough County Permits
Tampa area permits, inspections, reviews
ConnectorRecord IDCapturedLink
official_records_nocHillsborough_20260710242026-07-02Open ↗

Parcel Detail

Property records and ownership

Property
Parcel ID
057474-3086
County
Hillsborough
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/full-system-install-equal-exchange-1021-new-winsor-loop-sun-city-center-hillsbor-efa4099f