Leads/ff91f006
Approved · unknownPINELLAS County

USACE 404 — 319 BUTTONWOOD LANE

319 BUTTONWOOD LANE, LARGO, FL, 33770

Load estimate pending
Lifecycle
Permitted as of Mar 7, 2016
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

USACE 404 — 319 BUTTONWOOD LANE

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 3/7/2016 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
0.2178 ac
Parcel 189364
Est truck loads
Needs site plan parse
Sources seen
2
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant
HOGGARD, THOMAS BRETT
Why this is a hauling opportunity: Base public_works/earthwork (65) | stage=permit_issued, but stale (10y old)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_SPGP
    Captured FDEP_SPGP_0341541-001-EG from fdep_spgp
  2. 2026-07-02PCPAO
    Captured PCPAO_189364_ff91f006 from pcpao

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest export sink (landfill)
ANGELO'S RECYCLED MATERIALS - LARGO MRF · Largo
One-way
3.9 mi
Round trip
7.8 mi
Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
23.9 mi
Round trip
47.8 mi
TypeNameCityOne-wayRT mi
quarryTampa Cement Grinding PlantTampa23.9 mi47.8
quarryCaloosa MaterialsRuskin27.8 mi55.7
quarryCentral State Aggregates LLCZephyrhill38.6 mi77.2
quarryGeorgia Stone Spring Hill QuarryAtlanta 39.1 mi78.2
sand pitCounty Line MineSpring Hill39.6 mi79.2
landfillANGELO'S RECYCLED MATERIALS - LARGO MRFLargo3.9 mi7.8
transfer stationGREEN ENERGY TRANSPORT TRANSFER STATION (FKA WALKER HAULING)Clearwater6.7 mi13.3
transfer stationCLEARWATER MATERIALS TRANSFER FACILITYClearwater7.2 mi14.4
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
HOGGARD, THOMAS BRETT

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Pinellas County Permits
St. Pete / Clearwater ePlans & applications
ConnectorRecord IDCapturedLink
fdep_spgpFDEP_SPGP_0341541-001-EG2026-05-28Open ↗
pcpaoPCPAO_189364_ff91f0062026-07-02Open ↗

Parcel Detail

Pinellas County Property Appraiser

PropertyPCPAO
Folio
189364
Strap
06-30-15-35802-000-0690
Address
319 Buttonwood Ln
Zip
33770
Acreage
0.2178 ac
Sq ft
9,487
Year built
2017
Use
0110 Single Family ...
Subdivision
HARBOR BLUFFS SEC 4
Owner of record
HOGGARD, THOMAS BRETT
HOGGARD, KRISTINA MARIE
Last sale
2015-11-01
$482,500
Appraiser valuation
Just (market)
$2,331,154
Assessed
$1,172,568
Taxable
$1,121,846

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/ff91f006