Leads/ff0f4ac1
Approved · unknownHILLSBOROUGH County

Cleanup (petroleum cleanup) — HOWARD F CURREN AWT PLANT

2700 MARITIME BLVD, TAMPA, FL, 33605

~4.5kloads
fill dirt + base rock
~7 mo
Lifecycle
Active as of Jun 12, 2026
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Construction underway — hauling demand peaks here

Location

The workspace from above — satellite by default

Cleanup (petroleum cleanup) — HOWARD F CURREN AWT PLANT

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No cost signal yet
Acreage
17.934 ac
Parcel 1993400000
Est truck loads
Needs site plan parse
Hauling revenue est
@ $120/load
General Contractor

Not yet identified

Developer / Applicant
CITY OF TAMPA
Why this is a hauling opportunity: Base site_development/earthwork (65) | size signal: 18 ac disturbed, ~4484 est. loads (+25) | stage=under_construction, recent (+10) | government/public-authority project (floor 55)

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-06-12FDEP_CLEANUP_SITES
    Captured FDEP_CLEANUP_87954831 from fdep_cleanup_sites
  2. 2026-06-21HCPA
    Captured HCPA_1993400000_ff0f4ac1 from hcpa

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations — with haul rate suggestions

Closest import source (quarry)
Tampa Cement Grinding Plant · Tampa
One-way
0.8 mi
Round trip
1.7 mi · ~25 min
Rate / load
$85–$110
TypeNameCityOne-wayRT mi~CycleRate / load
quarryTampa Cement Grinding PlantTampa0.8 mi1.7~25m$85–$110
quarryCaloosa MaterialsRuskin15.3 mi30.7~75m$175–$230
quarryCentral State Aggregates LLCZephyrhill21.1 mi42.2~75m$175–$230
quarryFour CornersLithia30.5 mi61.1~100m$230–$290
quarryGeorgia Stone Spring Hill QuarryAtlanta 32.0 mi64~100m$230–$290
quarryWingate Creek MineLithia35.1 mi70.2~100m$230–$290
quarrySouth Pasture MineLithia35.6 mi71.1~100m$230–$290
sand pitCounty Line MineSpring Hill36.0 mi71.9~100m$230–$290
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Rate bands are FL tri-axle dump market (15–20 CY/load), conservative midpoint. Phase 2 will add Mapbox-routed actual drive distance + truck-type/fuel modifiers.

Contact Graph

Who's involved and how

Developer
CITY OF TAMPA

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Hillsborough County Permits
Tampa area permits, inspections, reviews
ConnectorRecord IDCapturedLink
fdep_cleanup_sitesFDEP_CLEANUP_879548312026-06-12Open ↗
hcpaHCPA_1993400000_ff0f4ac12026-06-21Open ↗

Parcel Detail

Hillsborough Property Appraiser

PropertyHCPA
Folio
1993400000
Strap
A-30-29-19-ZZZ-000005-94510.0
Address
2700 MARITIME BLVD, TAMPA
Zip
33605
Acreage
17.934 ac
Sq ft
781,196
Homestead
NO
2700 MARITIME BLVD, TAMPA
Owner of record
CITY OF TAMPA
Last sale
1980-01-01
$100(transfer)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
0 chars

/leads/ff0f4ac1