Leads/ferrier-marianne-project-sarasota-county-sarasota-fl-be3ba1f5
Approved · unknownSarasota County

FERRIER MARIANNE project — Sarasota County

1776 ALTA VISTA ST

Load estimate pending
Lifecycle
Permitted as of May 28, 2021
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

FERRIER MARIANNE project — Sarasota County

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor
FERRIER MARIANNE
Developer / Applicant
FERRIER PAUL
Why this is a hauling opportunity: NOC with no description — unknown scope | Connector base: 50 | Stage = permit_issued — actionable now (+10) | stage=permit_issued, but stale (5y old) | individual owner, residential scale — capped low | stage=permit_issued, but stale (5y old) | individual owner, residential scale — capped low | stage=permit_issued, but stale (5y old) | individual owner, residential scale — capped low | stage=permit_issued, but stale (5y old) | individual owner, residential scale — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-21SARASOTA_NOC
    Captured Sarasota_2021099927 from sarasota_noc

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Caloosa Materials · Ruskin
One-way
26.7 mi
Round trip
53.3 mi
TypeNameCityOne-wayRT mi
quarryCaloosa MaterialsRuskin26.7 mi53.3
quarryWingate Creek MineLithia27.9 mi55.7
quarryFlorida Shell & Fill Company LLCNaples28.8 mi57.5
quarry4M-31 MineAlva42.1 mi84.2
quarrySouth Pasture MineLithia42.2 mi84.4
quarryTampa Cement Grinding PlantTampa42.5 mi84.9
sand pitWashington Loop MinePunta Gorda43.7 mi87.3
quarryBermont Materials AlicoPunta Gorda45.4 mi90.8
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

Developer
FERRIER PAUL
Contractor
FERRIER MARIANNE
1 active project · Sarasota

Permits & Sources

Every connector that's seen this project

ACTIVENotice of Commencement (NOC)(Notice of Commencement)

Recorded with the county right before work physically starts, and it names the contractor. When this appears, trucks are weeks (or days) away — the haul contract is usually already let, so speed matters.

Official source-of-truth portal
Sarasota County Permits
Sarasota / Venice building permit search
ConnectorRecord IDCapturedLink
sarasota_nocSarasota_20210999272026-05-21Open ↗

Parcel Detail

Property records and ownership

Property
County
Sarasota
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/ferrier-marianne-project-sarasota-county-sarasota-fl-be3ba1f5