Leads/fe9dc7a0
Approved · unknownCOLUMBIA County

Mitigation bank — Bayfield (2,000 ac)

Bayfield, COLUMBIA County, FL

Load estimate pending
Lifecycle
Permitted as of Mar 10, 2011
  1. Filed
  2. Permitted
  3. Active
  4. Completed

Approved / NOC filed / permit issued — ready to break ground

Location

The workspace from above — satellite by default

Mitigation bank — Bayfield (2,000 ac)

My Pipeline

Tag this lead — private to you, builds your bid history over time

Loading pipeline status…

Summary

Key numbers at a glance

⚡ Early signal — no contractor on record yet

The permit cleared on 3/10/2011 but no contractor shows on any filing — the haul work has likely not been awarded. Reaching the developer or engineer now beats bidding against a locked-in GC later.

Project value
No recorded value on file
Acreage
Est truck loads
Needs site plan parse
Sources seen
1
Public records referencing this job
General Contractor

Not yet identified

Developer / Applicant

Not yet identified

Why this is a hauling opportunity: Mitigation bank — 2,000 ac of wetland restoration. Multi-year project with fill / grading / water control structures. Contact: Elva Peppers. | stage=permit_issued, but stale (15y old) | single-trade residential permit — capped low | stage=permit_issued, but stale (15y old) | single-trade residential permit — capped low | stage=permit_issued, but stale (15y old) | single-trade residential permit — capped low | stage=permit_issued, but stale (15y old) | single-trade residential permit — capped low

Lifecycle Timeline

Every signal we've seen, in order

  1. 2026-05-28FDEP_MITIGATION_BANKS
    Captured FDEP_MITBANK_288852-001 from fdep_mitigation_banks

Hauling Demand Estimator

Cut/fill volumes, drainage, and utility trenches from the site plan

No site plan parsed yet — once Claude extracts the plan PDF for this project, cut/fill and drainage features fill this section.

Material Sourcing

Nearest pits, quarries, landfills, and transfer stations

Closest import source (quarry)
Ag Lime Gyp Stack · Lake City
One-way
11.1 mi
Round trip
22.2 mi
TypeNameCityOne-wayRT mi
quarryAg Lime Gyp StackLake City11.1 mi22.2
quarrySwift Creek MineWhite Springs27.0 mi54.1
quarryBeachville MineLive Oak36.1 mi72.1
quarrySuwannee American CementBranford37.4 mi74.7
quarrySUWANNEE AMERICAN CEMENTBranford37.4 mi74.7
quarrySUWANNEE COUNTY PUBLIC WORKSLIVE OAK38.1 mi76.1
quarryBlue Rok Incorporatedperry42.8 mi85.6
quarryTOWNSEND PITBell45.4 mi90.9
See /material-sources for the full directory.

Distance is great-circle from the project centroid to the source centroid. Routed drive distance is planned.

Contact Graph

Who's involved and how

No companies linked yet.

Permits & Sources

Every connector that's seen this project

Official source-of-truth portal
Columbia County Permits
Lake City Building & Code Compliance
ConnectorRecord IDCapturedLink
fdep_mitigation_banksFDEP_MITBANK_288852-0012026-05-28Open ↗

Parcel Detail

Property records and ownership

Property
County
COLUMBIA
Property appraiser data not yet linked. (HCPA connector matches by address — fails on legal-description rows.)

Site Plan & Engineering

Linked documents

No site plan documents yet. (PDF extraction connector pending.)

Bid Data

Who bid, who won

No bid data. (Public bid connectors pending.)

Activity & Notes

Your internal log

Loading notes…
Log call:
0 chars

/leads/fe9dc7a0