FDOT — (US 17 / N MAIN ST) FROM TROUT RIVER BRIDGE TO N OF...

Strong 85
HotStrongWarmQualifying
awarded publicpublic worksroadway
Contract: T2A54Awarded: Feb 18, 2026To: Preferred Materials Inc.

Score breakdown — 85/100

+
Contract Awarded

GC selected — material delivery and earthwork hauling imminent

+
Roadway Work

Road construction requires heavy aggregate, fill, and asphalt hauling

+
3 Contractors Linked

Known companies — contact info available for outreach

AI Summary

The FDOT roadway project involves improvements along US 17/N Main St from the Trout River Bridge northward, representing a significant public works initiative. This project is critical for hauling providers as it will require extensive earthwork, asphalt, and other materials, creating multiple opportunities for trucking and hauling services. Key contacts for collaboration include Preferred Materials Inc., the prime general contractor, and subcontractors Duval Asphalt Products, Inc. and Unit Price Ext Amount, all of which are positioned to manage material logistics effectively.

Scope signals

Project type
public works
Work class
roadway
Keywords
T2A54, CO, FDOT, letting, roadway, (US 17 / N MAIN ST) FROM TROUT RIVER BRIDGE TO N OF...
Jurisdiction
FL

Company roles