FDOT Resurfacing — SR228 FROM: HART BRIDGE TO: BEACH BOULEVARD (Duval Co.)
SR228 FROM: HART BRIDGE TO: BEACH BOULEVARD, Duval County, FL
Score breakdown — 70/100
State-funded project in the 5-Year Work Program — guaranteed funding
Project in early stages — good time to build GC relationships
Road construction requires heavy aggregate, fill, and asphalt hauling
Known companies — contact info available for outreach
AI Summary
FDOT is resurfacing SR228 between Hart Bridge and Beach Boulevard in Duval County, a state-level roadway project currently in active bidding with strong hauling demand for asphalt millings, aggregate base, and debris removal. The project offers significant opportunity for material haul-off and recycled asphalt transport as a FY2026 initiative. Contact **Janus Construction Corp.** (prime GC) at **(301) 850-4770** immediately to establish hauling partnerships before bid award.
Location
Exact project coordinates not available — pin shows approximate county-level area
Scope signals
- Project type
- public works
- Work class
- roadway
- Permit types
- FDOT Work Program
- Keywords
- FDOT, RESURFACING, DUVAL, District 02, FY2026, 43731815201, SR228 FROM: HART BRIDGE TO: BEACH BOULEVARD
- Jurisdiction
- Duval, FL