FDOT Resurfacing — SR121(34TH STREET) (Alachua Co.)
SR121(34TH STREET) FROM SR331(SE WILLISTON RD) TO NW 16TH BLVD, Alachua County, FL
Score breakdown — 70/100
State-funded project in the 5-Year Work Program — guaranteed funding
Project in early stages — good time to build GC relationships
Road construction requires heavy aggregate, fill, and asphalt hauling
Known companies — contact info available for outreach
AI Summary
FDOT is resurfacing approximately 5+ miles of SR121 (34th Street) in Alachua County from SR331 to NW 16th Boulevard, with work anticipated in FY2028. This pre-construction phase project will generate significant demand for asphalt millings removal, base material haul-off, and potential aggregate/fill deliveries as the roadway is milled and resurfaced. Contact Preferred Materials Inc. (prime GC, 813-973-2888) now to position for material supply and demolition haul contracts during the active construction phase.
Location
Exact project coordinates not available — pin shows approximate county-level area
Scope signals
- Project type
- public works
- Work class
- roadway
- Permit types
- FDOT Work Program
- Keywords
- FDOT, RESURFACING, ALACHUA, District 02, FY2028, 20771265201, SR121(34TH STREET) FROM SR331(SE WILLISTON RD) TO NW 16TH BL
- Jurisdiction
- Alachua, FL