FDOT Resurfacing — SR104(DUNN AVE) (Duval Co.)
SR104(DUNN AVE) FROM SR15(US1)NEW KINGS RD TO I-295(SR9A), Duval County, FL
Score breakdown — 70/100
State-funded project in the 5-Year Work Program — guaranteed funding
Project in early stages — good time to build GC relationships
Road construction requires heavy aggregate, fill, and asphalt hauling
Known companies — contact info available for outreach
AI Summary
FDOT is resurfacing SR104 (Dunn Avenue) from US-1 to I-295 in Duval County—a multi-mile roadway project currently in pre-construction with FY2028 funding. This resurface job will require significant hauling of milled asphalt, fill material, and debris removal, representing strong demand for dump trucks and material transport throughout the construction phase. Hubbard Construction Company (407-654-3201) is the prime GC; contact them now during the early planning stage to lock in hauling contracts before competition intensifies.
Location
Exact project coordinates not available — pin shows approximate county-level area
Scope signals
- Project type
- public works
- Work class
- roadway
- Permit types
- FDOT Work Program
- Keywords
- FDOT, RESURFACING, DUVAL, District 02, FY2028, 20914235201, SR104(DUNN AVE) FROM SR15(US1)NEW KINGS RD TO I-295(SR9A)
- Jurisdiction
- Duval, FL