FDOT Resurfacing — SR 699/TOM STUART CSWAY FR SR 699/GULF BLVD TO ALT (Pinellas Co.)

SR 699/TOM STUART CSWAY FR SR 699/GULF BLVD TO ALT US 19/SR 595, Pinellas County, FL

Warm 70
HotStrongWarmQualifying
in reviewpublic worksroadway
Contract: T7426Awarded: Feb 19, 2019To: Preferred Materials Inc.

Score breakdown — 70/100

+
FDOT Work Program

State-funded project in the 5-Year Work Program — guaranteed funding

Pre-Construction

Project in early stages — good time to build GC relationships

+
Roadway Work

Road construction requires heavy aggregate, fill, and asphalt hauling

+
1 Contractor Linked

Known companies — contact info available for outreach

AI Summary

This FDOT resurfacing project on SR 699/Tom Stuart Causeway in Pinellas County involves roadway reconstruction from Gulf Boulevard to US 19/SR 595, with significant hauling demand for asphalt removal, base course materials, and fill operations typical of state highway resurfacing work. With a 70/100 hauling score and project currently in pre-construction/early stages under FY2028 funding, now is an optimal time to establish relationships with prime contractor Preferred Materials Inc. (813-973-2888) to secure material supply and debris removal contracts before active construction mobilization.

Location

Exact project coordinates not available — pin shows approximate county-level area

Scope signals

Project type
public works
Work class
roadway
Permit types
FDOT Work Program
Keywords
FDOT, RESURFACING, PINELLAS, District 07, FY2028, 44792015201, SR 699/TOM STUART CSWAY FR SR 699/GULF BLVD TO ALT US 19/SR
Jurisdiction
Pinellas, FL

Company roles

Source records

fdot_workprogramFDOTWP_44792015201
View on FDOT
FDOT Resurfacing — SR 699/TOM STUART CSWAY FR SR 699/GULF BLVD TO ALT (Pinellas Co.) — Pinellas | Hauling Intel